01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01050 FIELD ENGINEERING<br />

Exhibit 2<br />

Page 226 of 379<br />

3.02 PERFORMANCE<br />

A. Surveyor’s Log: Maintain a surveyor’s log of control <strong>and</strong> other survey work.<br />

Make this log available for reference.<br />

B. Existing Utilities: Furnish information necessary to adjust, move, or relocate<br />

existing structures utility poles, lines, services, or other appurtenances located in<br />

or affected by demolition operations. Coordinate with local authorities having<br />

jurisdiction.<br />

C. Final Property Survey: Prepare a final property survey for the Project. Include<br />

on the survey certification, signed by the surveyor, that principal metes, bounds,<br />

lines, <strong>and</strong> level of the Project are accurately positioned as shown on the<br />

drawings in hard copy along with ACAD <strong>and</strong> PDF format on a CD.<br />

END OF SECTION 01050 - FIELD ENGINEERING<br />

Section 01050 Field Engineering Page 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!