DIVISION 1 SPECIFICATIONS<br />

SECTION 01340 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES<br />

a. Shop Submittal Number:<br />

b. Deviations: None ; as listed<br />

c. Reference Specification Number:<br />

d. Reference Drawing Number: ______<br />

e. Space Requirement: As designed _______<br />

Different, As listed<br />

f. Contractor has reviewed <strong>and</strong> submitted for review.<br />

Signature:<br />

Date:<br />

E. ADDITIONAL COPIES:<br />

1. Provide additional copies of submittals required by Governing Authorities<br />

that are in addition to copies specified for submittal to the CPM <strong>and</strong> the<br />

CONSULTANT.<br />

1.05 SPECIFIC SUBMITTAL REQUIREMENTS<br />

A. GENERAL<br />

Exhibit 2<br />

Page 275 of 379<br />

1. Where it is necessary to provide intermediate submittals <strong>between</strong> the<br />

initial <strong>and</strong> final submittals, provide <strong>and</strong> process intermediate submittals in<br />

the same manner as for initial submittals.<br />

2. Shop Drawings, Product Data <strong>and</strong> Samples submitted to the CPM <strong>and</strong><br />

the CONSULTANT for review shall first be checked <strong>and</strong> approved by the<br />

CONTRACTOR. Shop Drawings, Product Data <strong>and</strong> Samples received<br />

without the CONTRACTOR’s “check <strong>and</strong> approved” stamp will be cause<br />

for immediate return without further action. Each drawing correctly<br />

submitted will be checked by the CONSULTANT <strong>and</strong> marked accordingly.<br />

3. Specific submittal requirements for individual units of Work are specified<br />

in the applicable specification section. Except as otherwise indicated in<br />

the individual specification sections, comply with the requirements<br />

specified herein for each type of submittal.<br />

4. In submitting shop drawings, product data, <strong>and</strong> similar items for review, at<br />

least seven (7) copies shall be submitted, five (5) to the CONSULTANT<br />

<strong>and</strong> two (2) to the CPM. This number includes two (2) for return to the<br />

CONTRACTOR. If the CONTRACTOR desires more than two (2) copies<br />

returned to him, he shall submit to the CONSULTANT with the initial <strong>and</strong><br />

subsequent transmittals the additional number desired up to a maximum<br />

of an additional three (3) copies. If the CONSULTANT requires additional<br />

copies, he will so inform the CONTRACTOR upon return of the reviewed<br />

material. Additional copies of shop drawings will be requested in the case<br />

where the subject matter shown thereon requires coordination of two (2)<br />

or more Prime Contracts.<br />

5. Shop <strong>and</strong> setting drawings shall present complete <strong>and</strong> accurate<br />

information relative to all working dimensions, equipment weight<br />

assembly <strong>and</strong> sectional view, all necessary details pertaining to<br />

coordinating the Work of the Contract, lists of materials <strong>and</strong> finishes, parts<br />

lists <strong>and</strong> the description thereof, lists of spare parts <strong>and</strong> tools where such<br />

parts or tools are required, no-scale control diagrams for control wiring<br />

Section 01340 Shop Drawings, Product Data <strong>and</strong> Samples Page 70