01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01255 CPEAM PROCEDURES<br />

Exhibit 2<br />

Page 234 of 379<br />

areas for arriving delivery vehicles. The CONTRACTOR’s employees shall<br />

utilize the designated CONTRACTOR employee parking area.<br />

1. Adequate accommodations for intersecting <strong>and</strong> crossing traffic<br />

shall be provided <strong>and</strong> maintained <strong>and</strong>, except where specific<br />

permission is given, no road or street crossing the Project shall be<br />

blocked or unduly restricted<br />

L. The State of Florida, Manual of Traffic Control <strong>and</strong> Safe Practices for Street <strong>and</strong><br />

Highway Construction, Maintenance <strong>and</strong> Utility Operations, sets for the basic<br />

principles <strong>and</strong> prescribes minimum st<strong>and</strong>ards to be followed in the design,<br />

application, installation, maintenance, <strong>and</strong> removal of all traffic control devices<br />

<strong>and</strong> all warning devices <strong>and</strong> barriers, which are necessary to protect the public<br />

<strong>and</strong> workmen from hazards within the Project limits. The st<strong>and</strong>ards established<br />

in the aforementioned manual constitute the minimum requirements for normal<br />

conditions <strong>and</strong> additional traffic control devices, warning devices, barriers or<br />

other safety devices will be required where unusual, complex or particular<br />

hazardous conditions exist.<br />

M. Installation: The responsibility for installation <strong>and</strong> maintenance of adequate traffic<br />

control devices, warning devices <strong>and</strong> barriers, for the protection of the traveling<br />

public <strong>and</strong> workmen, as well as to safeguard the Work shall rest with the<br />

CONTRACTOR. The required traffic control devices, warning devices <strong>and</strong><br />

barriers shall be erected by the CONTRACTOR prior to creation of any<br />

hazardous condition <strong>and</strong> in conjunction with any necessary re-routing of traffic.<br />

The CONTRACTOR shall immediately remove, turn or cover any devices or<br />

barriers that do not apply to existing conditions.<br />

1. The CONTRACTOR shall make the CPM aware of any scheduled<br />

operation, which will affect patterns or safety, sufficiently in advance of<br />

commencing such operation to permit his review of the plan for<br />

installation of traffic control devices or barriers proposed by the<br />

CONTRACTOR.<br />

2. When needed, the CONTRACTOR shall assign one of his employees the<br />

responsibility of maintaining the positions <strong>and</strong> condition of all<br />

Maintenance of Traffic control devices, warning devices <strong>and</strong> barriers<br />

throughout the duration of the Contract. The CPM shall be kept advised<br />

at all times as to the identification <strong>and</strong> means of contacting this employee<br />

on a twenty-four (24) hour basis.<br />

N. Furnishing of Devices <strong>and</strong> Barriers: The CONTRACTOR shall furnish all traffic<br />

control devices (including signs), warning devices, arrow boards, <strong>and</strong> barriers.<br />

Section 01255 CPEAM Procedures Page 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!