DIVISION 1 SPECIFICATIONS<br />

SECTION 01040 PROJECT COORDINATION<br />

Exhibit 2<br />

Page 217 of 379<br />

was applied against, the cost of the initial item, the cost of the selected item, the<br />

ability of the value item to perform with the same functionality <strong>and</strong> safety level as<br />

the initial item, the decision of incorporating the value item in the design <strong>and</strong><br />

notes; the Work items that received constructability review, aspects of the initial<br />

design, aspects of the final design, the cost or time savings of the proposed<br />

constructability review item, the decision of incorporating the constructability item<br />

in the final design, <strong>and</strong> notes; the Work items that received gap analysis shall be<br />

identified, <strong>and</strong> a solution to the gap noted. A draft copy of this report shall be<br />

submitted to the CPM within 30-calendar days after the 100% construction<br />

documents are completed, for approval. The CONTRACTOR shall update the<br />

draft report <strong>and</strong> submit the final report to the CPM within 60-calendar days after<br />

the 100% construction documents are complete.<br />

B. Reporting Unusual Events: When an event of an unusual <strong>and</strong> significant nature<br />

occurs at the site, CONTRACTOR shall prepare <strong>and</strong> submit a special report to<br />

the CPM. List chain of events, persons participating, response by the<br />

CONTRACTOR’s personnel, an evaluation of the results or effects <strong>and</strong> similar<br />

pertinent information. Advise the CPM <strong>and</strong> CONSULTANT as soon as possible<br />

when such events are known.<br />

PART 2 - PRODUCTS<br />

(Not Used)<br />

PART 3 - EXECUTION<br />

3.01 GENERAL COORDINATION PROVISIONS<br />

Inspection of Conditions: Inspect conditions under which work is to be performed. Do<br />

not proceed until unsatisfactory conditions have been corrected in an acceptable<br />

manner.<br />

END OF SECTION 01040 - PROJECT COORDINATION<br />

Section 01040 Project Coordination Page 12