01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01095 REFERENCE STANDARDS AND DEFINITIONS<br />

Exhibit 2<br />

Page 229 of 379<br />

1.03 INDUSTRY STANDARDS<br />

must be fulfilled indirectly by the CONTRACTOR or by others when so<br />

noted.<br />

A. Applicability of St<strong>and</strong>ards. Unless the Contract Documents include more<br />

stringent requirements, applicable construction industry st<strong>and</strong>ards shall have the<br />

same force <strong>and</strong> effect as if bound or copied directly into the Contract Documents<br />

to the extent referenced. Such st<strong>and</strong>ards are made a part of the Contract<br />

Documents by reference.<br />

B. Publication Dates. CONTRACTOR shall comply with the st<strong>and</strong>ards in effect as<br />

of the date of the Contract Documents.<br />

C. Conflicting Requirements. Where compliance with 2 or more st<strong>and</strong>ards is<br />

specified <strong>and</strong> the st<strong>and</strong>ards establish different or conflicting requirements for<br />

minimum quantities or quality levels, CONTRACTOR shall comply with the most<br />

stringent requirement, <strong>and</strong> shall refer uncertainties <strong>and</strong> requirements that are<br />

different but apparently equal to the CPM for a decision before proceeding.<br />

1. Minimum Quantity or Quality Levels. The quantity or quality level shown<br />

or specified shall be the minimum provided or performed. The actual<br />

installation may comply exactly with the minimum quantity or quality<br />

specified, or it may exceed the minimum within reasonable limits. To<br />

comply with these requirements, indicated numeric values are minimum<br />

or maximum, as appropriate, for the context of the requirements.<br />

CONTRACTOR shall refer uncertainties to the CPM for a decision before<br />

proceeding.<br />

D. Copies of St<strong>and</strong>ards. Each entity engaged in construction on the Project shall be<br />

familiar with industry st<strong>and</strong>ards applicable to its construction activity. Copies of<br />

applicable st<strong>and</strong>ards are not bound with the Contract Documents.<br />

1. Where copies of st<strong>and</strong>ards are needed to perform a required construction<br />

activity, the CONTRACTOR shall obtain copies directly from the<br />

publication source <strong>and</strong> make them available on request.<br />

E. Abbreviations <strong>and</strong> Names. Trade association names <strong>and</strong> titles of general<br />

st<strong>and</strong>ards are frequently abbreviated. Where abbreviations <strong>and</strong> acronyms are<br />

used in the Specifications or other Contract Documents, they shall mean the<br />

recognized name of the trade association, st<strong>and</strong>ards-generating organization,<br />

authorities having jurisdiction, or other entity applicable to the context of the text<br />

provision.<br />

Section 01095 Reference St<strong>and</strong>ards <strong>and</strong> Definitions Page 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!