PART - GENERAL<br />

DIVISION 1 SPECIFICATIONS<br />

SECTION 01340 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES<br />

1.01 RELATED DOCUMENTS<br />

A. Related Sections<br />

1.02 DESCRIPTION<br />

1. DIVISION 01 - GENERAL REQUIREMENTS Section(s):<br />

01313 - CONSTRUCTION SCHEDULING MANAGEMENT SYSTEM<br />

01315 - PROGRESS SCHEDULES (COMPUTERIZED CPM)<br />

A. Work-Related Submittals:<br />

1. The provisions of the Section apply to those required submittals that are<br />

related to individual units of Work, not to administrative submittals, such<br />

as payment requests, insurance certificates <strong>and</strong> progress reports.<br />

2. In addition to specific provisions of the General Conditions regarding<br />

Work-related submittals, the Technical Specifications Sections contain<br />

submittal requirements.<br />

3. Specific requirements in other Contract Documents sections shall take<br />

precedence over the general requirements contained in this Section.<br />

1.03 SUBMISSION AND APPROVAL SCHEDULE<br />

Exhibit 2<br />

Page 272 of 379<br />

A. Immediately following development <strong>and</strong> acceptance of fully developed Progress<br />

Schedule specified under Sections 01315 - PROGRESS SCHEDULES<br />

(COMPUTERIZED CPM), prepare complete schedule of work-related submittals,<br />

including shop drawings, product data, <strong>and</strong> samples. Submit within ten (10) days<br />

of date required for establishment of Progress Schedule. Correlate Submittal<br />

Schedule with listing of principal subcontractors, with listing of products or<br />

procurements schedule.<br />

B. Color Schedule: Submit separate listing of items requiring color selection by the<br />

CONSULTANT in accordance with the Contract Documents.<br />

C. The CONTRACTOR shall prepare <strong>and</strong> submit in electronic Excel Format <strong>and</strong><br />

hard copies in triplicate each to the CONSULTANT <strong>and</strong> CPM a completely<br />

itemized Schedule of Shop Drawings, Product Data <strong>and</strong> Samples, listing each<br />

<strong>and</strong> all such items as required under the specifications. Schedules shall indicate<br />

for each required item:<br />

1. Prepare Schedule in chronological sequence of first submittals.<br />

2. Show category of submittal, generic description of work covered, activity<br />

or event number on progress schedule, scheduled date for first<br />

submission, <strong>and</strong> blank columns for actual date of submittal, resubmittal,<br />

<strong>and</strong> final release or acceptance by CONSULTANT.<br />

3. Identification as to pertinent Specification Division.<br />

4. Item(s) involved.<br />

5. Name of pertinent Subcontractor or supplier <strong>and</strong> the name of pertinent<br />

manufacturer.<br />

Section 01340 Shop Drawings, Product Data <strong>and</strong> Samples Page 67