DIVISION 1 SPECIFICATIONS<br />

SECTION 01255 CPEAM PROCEDURES<br />

Exhibit 2<br />

Page 232 of 379<br />

C. Active aviation <strong>and</strong> other public areas exist in <strong>and</strong> around the Airport. The<br />

CONTRACTOR shall not prevent traffic from using these areas. The Work shall<br />

be coordinated with the CPM, the Director of Aviation, FAA, CBP, TSA <strong>and</strong> other<br />

agencies having an interest in the capability of the Airport <strong>and</strong> shall be<br />

programmed <strong>and</strong> stated accordingly, so that public traffic may be routed over<br />

partially completed Work. Appropriate safety precautions shall be provided by<br />

the CONTRACTOR to protect employees, the public <strong>and</strong> the Work.<br />

D. Should it be necessary for the CONTRACTOR to complete portions of the<br />

Contract Work for the beneficial occupancy of the County prior to completion of<br />

the whole Work, such “phasing” of the Work shall be specified herein or indicated<br />

on the Drawings. When so specified, the CONTRACTOR shall complete such<br />

portions of the Work on or before the date specified or as otherwise specified.<br />

E. If the CONTRACTOR, with the concurrence of the CPM, elects to complete one<br />

increment of Work prior to completion of the whole Work, the County may at its<br />

sole discretion accept the Work for beneficial occupancy.<br />

F. When the Work is in, or near vehicular traffic <strong>and</strong> pedestrian areas, arrange the<br />

Work so as to avoid disruption of normal traffic patterns. Provide, erect <strong>and</strong><br />

maintain effective barricades, danger signals, signs <strong>and</strong> equipment to provide<br />

protection of the Work <strong>and</strong> the safety of the public throughout the area.<br />

G. The CONTRACTOR shall maintain traffic within the limits of the Project for the<br />

duration of the construction period, including all temporary suspensions of Work.<br />

It shall include the construction <strong>and</strong> maintenance of all necessary detour<br />

facilities; the furnishing, installing <strong>and</strong> maintaining of traffic control <strong>and</strong> safety<br />

devices during construction, the control of dust, <strong>and</strong> any other special<br />

requirements for safe <strong>and</strong> expeditious movement of aircraft, vehicular traffic <strong>and</strong><br />

pedestrians.<br />

1. Beginning Date of CONTRACTOR’s Responsibility. The CONTRACTOR’s<br />

responsibility for maintenance of traffic shall begin on the day he starts any<br />

field construction work including Early Construction <strong>and</strong> GMP Construction<br />

Work on the Project or on the date of any Notice to Proceed whichever is<br />

earlier, <strong>and</strong> shall continue until the date of Final Completion <strong>and</strong><br />

Acceptance of the Work. However, a portion of Early Construction Work or<br />

Early Investigative Work may also require MOT. The need for MOT will be<br />

decided at the time of the beginning of such work at the discretion of the<br />

CA.<br />

2. Number of Traffic Lanes. CONTRACTOR shall close no more than one<br />

(1) lane on each roadway <strong>and</strong> ramp. Unless otherwise specified, the<br />

Section 01255 CPEAM Procedures Page 27