DIVISION 1 SPECIFICATIONS<br />

SECTION 01340 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES<br />

Exhibit 2<br />

Page 278 of 379<br />

options are applicable to the project. Where product data has been<br />

printed to include information on several similar products, some of which<br />

are not required for use on the project, or are not included in this<br />

submittal, mark the copies to show clearly that such information is not<br />

applicable.<br />

a. Where product data must be specially prepared for required<br />

products, materials, or systems, because st<strong>and</strong>ard printed data is<br />

not suitable for use, submit data as “shop drawings” <strong>and</strong> not as<br />

“product data”.<br />

b. Clearly mark each copy to identify pertinent products or models.<br />

c. Show performance characteristics <strong>and</strong> capacities.<br />

d. Show dimensions <strong>and</strong> clearances required.<br />

e. Show wiring or piping diagrams <strong>and</strong> controls.<br />

f. Indicate finish.<br />

g. Supplement st<strong>and</strong>ard information to furnish information<br />

specifically applicable to Work.<br />

h. Modify drawings <strong>and</strong> diagrams to delete information, which is not<br />

applicable to Work.<br />

3. Submittals: Product data submittal is required for information <strong>and</strong> record<br />

<strong>and</strong> to determine that the products, materials, <strong>and</strong> systems comply with<br />

the provisions of the Contract Documents. Therefore, the initial submittal<br />

is also the final submittal, except where the CONSULTANT observes that<br />

there is non-compliance with the provisions of the Contract Documents<br />

<strong>and</strong> returns the submittal promptly to the CONTRACTOR marked with the<br />

appropriate “Action”.<br />

a. Provide two (2) preliminary single-copy submittals where required,<br />

for selection of options by the CPM <strong>and</strong> the CONSULTANT.<br />

4. Submit four (4) copies to the CONSULTANT <strong>and</strong> two (2) copies to the<br />

CPM of each required product data submittal, plus two (2) additional<br />

copies where required for maintenance manuals. Two (2) copies will be<br />

returned to the CONTRACTOR, marked with “Action” <strong>and</strong> corrections or<br />

modifications as required, the remainder will be retained.<br />

a. Do not submit product data or allow its use on the project, until<br />

compliance with the requirements of the Contract Documents has<br />

been confirmed by the CONTRACTOR.<br />

5. Final Distribution: Furnish copies of product data to subcontractors,<br />

suppliers, fabricators, manufacturers, installers, governing authorities <strong>and</strong><br />

others as required for proper performance of the Work. Show distribution<br />

on transmittal forms.<br />

6. Installation Copy: Do not proceed with installation of materials, products<br />

<strong>and</strong> systems until a copy of product data applicable to the installation is in<br />

the possession of the Installer. Do not permit the use of unmarked copies<br />

of product data in connection with the performance of the Work.<br />

Section 01340 Shop Drawings, Product Data <strong>and</strong> Samples Page 73