DIVISION 1 SPECIFICATIONS<br />

SECTION 01560 PREVENTION, CONTORL AND ABATEMENT<br />

OF EROSION AND WATER POLLUTION CONTROL<br />

Exhibit 2<br />

Page 319 of 379<br />

B. Schedule operations such that the area of unprotected erodible earth<br />

exposed at any one time is not larger than the minimum area necessary for<br />

efficient construction operations; <strong>and</strong> the duration of exposed,<br />

uncompleted construction to the elements shall be as short as practicable.<br />

1.05 PROTECTION OF STORM DRAINS<br />

A. Storm drain facilities, both open <strong>and</strong> closed conduit, serving the construction<br />

area shall be protected from pollutants <strong>and</strong> contaminants.<br />

B. If the CPM determines that siltation of drainage facilities has resulted due to the<br />

project, the CPM will advise the CONTRACTOR to remove <strong>and</strong> properly dispose<br />

of the deposited materials without an increase to the GMP.<br />

C. Should the CONTRACTOR fail to or elect not to remove the deposits, the<br />

<strong>COUNTY</strong> will provide maintenance cleaning as necessary <strong>and</strong> charge all<br />

costs of such service against the amount of money due or to become due<br />

the CONTRACTOR.<br />

1.06 PREVENTION, CONTROL AND ABATEMENT REQUIREMENTS<br />

A. Provide, install, construct <strong>and</strong> maintain all coverings, mulching, sodding,<br />

s<strong>and</strong>bagging, berms, slope drains, hay <strong>and</strong> straw bales, sedimentation structures<br />

or other devices necessary to meet City, State <strong>and</strong> Federal regulatory agency<br />

codes, rules <strong>and</strong> laws, <strong>and</strong> as indicated on the Drawings.<br />

B. The locations <strong>and</strong> methods of operation in all detention areas, borrow pits,<br />

material supply pits <strong>and</strong> disposal areas furnished by the CONTRACTOR shall<br />

meet the approval of the CPM as being such that erosion during <strong>and</strong> after<br />

completion of the Work will not likely result in detrimental siltation of water<br />

pollution.<br />

C. The CPM may limit the surface areas of unprotected erodible earth exposed by<br />

clearing <strong>and</strong> grubbing, excavation or filling operations <strong>and</strong> may direct the<br />

CONTRACTOR to provide immediate erosion or pollution control measures to<br />

prevent siltation or contamination of any river, stream, lake, tidal waters,<br />

reservoir, canal or other impoundment or to prevent damage to the Project or<br />

property outside the project right of way.<br />

PART 2 – PRODUCTS<br />

PART 3 - EXECUTION<br />

(Not Used)<br />

(Not Used)<br />

END OF SECTION 01560 - PREVENTION, CONTROL AND ABATEMENT OF EROSION AND<br />

WATER POLLUTION<br />

Section 01560 Prevention, Control <strong>and</strong> Abatement Page 114<br />

of Erosion <strong>and</strong> Water Pollution Control