DIVISION 1 SPECIFICATIONS<br />

SECTION 01255 CPEAM PROCEDURES<br />

Exhibit 2<br />

Page 239 of 379<br />

2. Excessive internal or external pressures<br />

3. Solvents.<br />

4. Chemicals.<br />

5. Light.<br />

6. Puncture.<br />

7. Abrasion.<br />

8. Heavy Traffic.<br />

9. Soiling.<br />

10. Combustion.<br />

11. High speed operation, improper lubrication, unusual wear.<br />

12. Improper shipping or h<strong>and</strong>ling.<br />

13. Theft.<br />

14. V<strong>and</strong>alism.<br />

D. Protection at Openings. CONTRACTOR shall provide protection at all openings<br />

in structures <strong>and</strong> finishes to maintain the building weather <strong>and</strong> dust tight as<br />

required to protect fixtures <strong>and</strong> equipment. All protection shall be of solid material<br />

<strong>and</strong> substantial so that it will not be disturbed by wind <strong>and</strong> weather normal to the<br />

area <strong>and</strong> season, <strong>and</strong> also tight-fitting to prevent noise infiltration.<br />

E. Protection of Improvements:<br />

1. Damage to Existing Facilities. Existing surfaces <strong>and</strong> materials of the<br />

County’s property not requiring Work by the Contract Documents that are<br />

damaged by the CONTRACTOR’s operation shall be immediately<br />

repaired. Repaired surfaces <strong>and</strong> materials shall reasonably match<br />

existing adjacent undamaged surfaces <strong>and</strong> materials as determined by<br />

the CONSULTANT / CPM. Repair Work shall be coordinated with the<br />

CPM with regard to time <strong>and</strong> method.<br />

2. All airport roads used by the CONTRACTOR during construction shall be<br />

restored <strong>and</strong>/or replaced to their original condition.<br />

3. Accidental Demolition: All structures or parts thereof that may become<br />

damaged due to accident or CONTRACTOR’s error shall be restored to<br />

their original condition without increasing the GMP. Materials <strong>and</strong><br />

equipment being used in the repair or replacement resulting from damage<br />

shall be new <strong>and</strong> shall perform at the manufacturer’s published<br />

capacities. If the existing equipment or materials cannot be identified, or<br />

if unavailable, the selection of the replacement will be subject to approval<br />

by the CPM in writing.<br />

4. New Carpet: Where separate contractor in areas has installed new<br />

carpeting, CONTRACTOR shall fully protect such new carpeting from all<br />

damage <strong>and</strong> staining by CONTRACTOR’s forces. In the event of any<br />

damages, the CONTRACTOR shall be responsible for repairing or<br />

replacing such new carpeting without increasing the GMP.<br />

Section 01255 CPEAM Procedures Page 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!