DIVISION 1 SPECIFICATIONS<br />

SECTION 01540 CONSTRUCTION SAFETY PLAN AND SECURITY REQUIREMENTS<br />

throughout the life of the Contract. The CONTRACTOR shall also install vehicle<br />

<strong>and</strong> pedestrian gates as necessary to provide adequate ingress/egress. The<br />

CONTRACTOR shall be solely responsible for access control through any<br />

access gate leading to the Aircraft Operations Area (AOA). This access control<br />

will be for all personnel using the gate for access to the AOA. The<br />

CONTRACTOR is solely responsible for all security within the Construction Area<br />

from the date of the Notice to Proceed until the date of Final Completion.<br />

Equipment not in use during construction, nights <strong>and</strong>/or holidays shall be parked<br />

here. The CONTRACTOR shall at all times conduct all operations under the<br />

Contract in a manner to avoid or minimize the risk of loss, theft or damage by<br />

v<strong>and</strong>alism, sabotage or the means to any property. The CONTRACTOR shall<br />

promptly take all reasonable precautions, which are necessary <strong>and</strong> adequate to<br />

correct all conditions, which threaten a risk of loss, theft or damage to property.<br />

K. During construction, the CONTRACTOR shall maintain these areas in neat<br />

condition. CONTRACTOR’s vehicles, equipment <strong>and</strong> materials shall be stored in<br />

the areas designated on the Drawings. Upon completion of the Work, the<br />

staging <strong>and</strong> storing areas shall be cleaned-up <strong>and</strong> returned to their original<br />

condition to the satisfaction of the CPM. Remove all construction fencing <strong>and</strong><br />

barricades from the Project Site. No special payment will be made for clean-up<br />

<strong>and</strong> restoration of the storage area. Personal vehicles shall not be permitted<br />

beyond the CONTRACTOR’s Construction Area. Drivers of personal vehicles<br />

being operated beyond this CONTRACTOR’s Construction Area shall be subject<br />

to loss of permission to enter the construction site.<br />

L. INTERMITTENT CONSTRUCTION OPERATIONS:<br />

Exhibit 2<br />

Page 307 of 379<br />

1. Heavy construction will require closing of certain areas by the CPM.<br />

However, some Work may be done on an intermittent basis. The<br />

CONTRACTOR shall maintain constant communication with the CPM<br />

when working <strong>and</strong> immediately obey all instructions from the CPM.<br />

Failure to so obey instructions or maintain constant communication with<br />

the CPM will cause to suspend the CONTRACTOR’s operations in the<br />

areas until satisfactory conditions are assured.<br />

2. When directed to cease Work <strong>and</strong> move from the area, the<br />

CONTRACTOR shall immediately respond <strong>and</strong> move all material,<br />

equipment <strong>and</strong> personnel outside areas. Operations shall not be<br />

resumed until directed by the CPM. Every reasonable effort will be made<br />

by the CPM or the CONSULTANT to cause minimum disturbance to the<br />

CONTRACTOR’s operations. However, no guarantee can be made as to<br />

the extent to which disturbance can be avoided. CONTRACTOR’s claim<br />

for additional Contract Time for any such disruption shall not be accepted.<br />

3. Open trenches or excavations exceeding 3-inches in depth <strong>and</strong> 3-inches<br />

in width shall not be permitted within 250 feet of the centerline of an<br />

active runway or within 100 feet of the centerline of active taxiways <strong>and</strong><br />

taxi lanes unless otherwise shown on the Drawings. If an area is to be<br />

opened to aircraft movement, either at night or during the day, the<br />

CONTRACTOR shall decrease the drop off to 3-inches by placing five<br />

percent (5%) maximum slope to existing grade. There is no separate<br />

payment for this temporary construction.<br />

Section 01540 Construction Plan <strong>and</strong> Safety Requirements Page 102