DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

5. Permanent Fire Protection: At earliest feasible date in each area of Project, complete<br />

installation of permanent fire-protection facility, including connected services, and place<br />

into operation and use. Instruct key personnel on use of facilities.<br />

6. Develop and supervise an overall fire-prevention and first-aid fire-protection program for<br />

personnel at Project site. Review needs with local fire department and establish<br />

procedures to be followed. Instruct personnel in methods and procedures. Post warnings<br />

and information.<br />

7. Provide temporary standpipes with fire hose valve connections for fire protection.<br />

8. Storage: Where materials and equipment are stored, and are of value or attractive for<br />

theft, provide secure lockup. Enforce discipline in connection with installation and<br />

release of material to minimize opportunity for theft and vandalism.<br />

3.5 OPERATION, TERMINATION, AND REMOVAL<br />

A. Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of<br />

temporary facilities to essential and intended uses to minimize waste and abuse.<br />

B. Maintenance: Maintain facilities in good operating condition until removal. Protect from<br />

damage caused by freezing temperatures and similar elements.<br />

1. Maintain operation of temporary enclosures, heating, cooling, humidity control,<br />

ventilation, and similar facilities on a 24-hour basis where required to achieve indicated<br />

results and to avoid possibility of damage.<br />

2. Prevent water-filled piping from freezing. Maintain markers for underground lines.<br />

Protect from damage during excavation operations.<br />

A. Operate Project-identification-sign lighting daily any time from dusk until dawn when<br />

personnel are on the site. Should no personnel be on the site after 12:00 midnight the project –<br />

identification lighting may be turned off at 12:00 midnight.<br />

B. Temporary Facility Changeover: Unless Contractor is able to utilize permanent fire protection,<br />

do not change over from using temporary security and protection facilities to permanent<br />

facilities until Substantial Completion.<br />

C. Termination and Removal: Remove each temporary facility when need for its service has<br />

ended, when it has been replaced by authorized use of a permanent facility, or no later than<br />

Substantial Completion. Complete or, if necessary, restore permanent construction that may<br />

have been delayed because of interference with temporary facility. Repair damaged Work, clean<br />

exposed surfaces, and replace construction that cannot be satisfactorily repaired.<br />

1. Properly recondition and restore those portions of the site occupied by temporary<br />

facilities and controls to condition acceptable to COTR, at least equal to condition at time<br />

of start of Work, unless otherwise authorized in writing by COTR.<br />

2. Materials and facilities that constitute temporary facilities are the property of Contractor.<br />

The Authority reserves right to take possession of Project identification signs.<br />

1. Remove temporary paving not intended for or acceptable for integration into permanent<br />

paving. Where area is intended for landscape development, remove soil and aggregate fill<br />

that do not comply with requirements for fill or subsoil. Remove materials contaminated<br />

with road oil, asphalt and other petrochemical compounds, and other substances that<br />

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!