DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

2) Hot rolled sheets and coils shall conform to ASTM A-569.<br />

3) Structural steel shapes shall conform to ASTM A-36.<br />

4) All welding electrodes shall conform to AWS A-5.2. Use the standard code<br />

for arc and gas welding in building construction as a guide to general<br />

procedure and qualification of welders.<br />

5) All fasteners shall conform to ASTM A-307 Class 2A thread fit for bolts<br />

and Class 2B thread fit for nuts. All fasteners shall be zinc plated or<br />

equivalent. All fasteners shall be locked with locknuts or lockwashers.<br />

6) All bearings and bolts shall be of standard sizes and the amount of different<br />

sizes shall be minimal where possible.<br />

1.4 DEFINITIONS<br />

A. Refer to the General Conditions and Supplementary General Conditions for additional<br />

definitions.<br />

B. Baggage Handling System (BHS): Transport system of baggage consisting of a complete<br />

system of static and dynamic mechanical, electrical and control components as specified in this<br />

section.<br />

C. Baggage Handling System Contractor (BHSC): Installer/coordinator of baggage handling<br />

system equipment working as either a General Contractor or as a Subcontractor to a General<br />

Contractor.<br />

D. Contractor: See Baggage Handling System Contractor (BHSC).<br />

E. Base Building Contractor/General Contractor: General Contractor (GC) for Base Building<br />

Contract.<br />

F. Owner: <strong>Metropolitan</strong> <strong>Washington</strong> <strong>Airports</strong> Authority (The Authority).<br />

G. COTR: See Division 01 Section “Summary.”<br />

1.5 PROJECT DESCRIPTION<br />

A. The BHSC shall work with General Contractor (GC) on scheduling and coordination of other<br />

disciplines.<br />

B. Contractor shall coordinate with other contractor to integrate the BHS with the following:<br />

1. Fire Alarm System (FAS)<br />

2. Access Control System (ACS)<br />

C. Contractor shall provide a fully operational and functional BHS as described herein.<br />

1.6 SYSTEM DESCRIPTION<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 6