DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. Product Data Manuals.<br />

2. Complete set of Record Drawings.<br />

3. Complete Test Reports.<br />

4. Warranty and Close-Out Documents.<br />

K. Product Data Manuals: upon completion of the project, submit final Product Data Manuals that<br />

include:<br />

1. A complete as-installed equipment list of all components installed with manufacturers'<br />

names and model numbers.<br />

2. A complete set of product data sheets for all products installed. Product data sheets shall<br />

be clearly marked, identifying the specific items installed.<br />

3. Updated and completed circuit schedule spreadsheets to reflect all voice and data<br />

horizontal wiring (station wiring), backbone cable and pairs used on each backbone to<br />

support each circuit, including circuit ID and user. This submittal shall be provided in<br />

both hard copy and in electronic format.<br />

4. Submit six (6) identical sets of Product Data Manuals with electronic copies of circuit<br />

schedule spreadsheets in MS Excel format.<br />

L. Record Drawings:<br />

1. As-Built documents are to include updating and revising contract documents to record<br />

actual locations (as-installed) of all equipment, pull boxes, devices, raceways, cabling,<br />

outlets, communications rooms and all Premise Distribution cable infrastructure<br />

components.<br />

2. As-Built drawings shall include:<br />

a. Complete floor plans and site plans, indicating placement and routing of asinstalled<br />

raceways, outlet locations and types with labels and cabling facilities<br />

installed under this scope of work.<br />

b. A complete Premise Distribution System riser diagram, showing as-installed<br />

originations, destinations, and type of pathways for all cabling. Include wire<br />

numbers, terminal block numbers and layouts, and other designations.<br />

c. Equipment rack/cabinet and wallboard as-installed elevation drawings shall be<br />

provided for each communication room and termination location.<br />

d. Wiring terminal point-to-point color-coded wiring diagrams. Drawings shall show<br />

each item of equipment, locations, all wiring, and all connections. Wiring color<br />

code shall be as described by the specifications. If no color code is specifically<br />

mentioned, the color code shall be as recommended by the equipment<br />

manufacturer.<br />

3. Submit six (6) full-size sets of drawings.<br />

4. Drawings shall be produced in the AutoCAD 2010.<br />

5. Submit all drawing files on CD-ROM.<br />

M. Test Reports: The Contractor shall be responsible for recording all test data. Copies of all test<br />

results are to be submitted to the COTR for review as part of final acceptance and subsequently<br />

submitted to The Authority for their records.<br />

PREMISE WIRING DISTRIBUTION SYSTEM 27 10 00 - 7