DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)<br />

A. Preparation: Submit four copies of list. Include name and identification of each space and area<br />

affected by construction operations for incomplete items and items needing correction<br />

including, if necessary, areas disturbed by Contractor that are outside the limits of construction.<br />

1. Organize list of spaces in sequential order, starting with exterior areas first and<br />

proceeding from lowest to highest floor.<br />

2. Organize items applying to each space by major element, including categories for ceiling,<br />

individual walls, floors, equipment, and building systems.<br />

3. Include the following information at the top of each page:<br />

a. Contract name and number.<br />

b. Date.<br />

c. Name of COTR.<br />

d. Name of Architect/Engineer.<br />

e. Name of Contractor.<br />

f. Page number.<br />

1.6 WARRANTIES<br />

A. Submittal Time: Submit one draft copy of proposed Warranty Manual Specified below not later<br />

than 90 days after Notice to Proceed. COTR will return comments to the Contractor no later<br />

than 30 calendar days after receipt.<br />

1. Provide Manufacturer’s Standard Warranties, made out to The Authority, and statement<br />

of willingness to provide any applicable Special Warranties required by the Contract<br />

Documents 14 calendar days prior to shipping of materials and equipment. Products and<br />

Equipment shall not be considered delivered (for payment purposes) until the approved<br />

warranties have been received.<br />

2. Submit written warranties on request of COTR for designated portions of the Work<br />

where commencement of warranties other than date of Substantial Completion is<br />

indicated.<br />

B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of<br />

designated portions of the Work that are completed and occupied or used by The Authority<br />

during construction period by separate agreement with Contractor.<br />

C. Warranty Manual: Organize warranty documents into an orderly sequence based on the table of<br />

contents of the Contract <strong>Specifications</strong>. Warranty documents include Contractor and major<br />

subcontractors warranty letters, special warranty documents, and manufacturer's warranties.<br />

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary<br />

to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve<br />

on spine to hold label describing contents. Binders shall not be filled beyond 75 percent<br />

of their rated capacity. Binders shall also have boomerang plastic sheet lifters, metal<br />

backbone, concealed rivet construction, and three-trigger position locking mechanism<br />

(lock, unlock, open) on top and bottom. Binder color shall be black unless another color<br />

is selected by COTR.<br />

PROJECT CLOSEOUT 01 77 00 - 4