22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

Division 06 – Wood, Plastics and Composites<br />

06 10 53 – Miscellaneous Rough Carpentry 06 10 53-1 – 06 10 53-4<br />

06 41 16 - Plastic-Laminate-Faced Architectural Cabinets 06 41 16-1 – 06 41 16-6<br />

Division 07 – Thermal and Moisture Protection<br />

07 21 00 – Thermal Insulation 07 21 00-1 – 07 21 00-5<br />

07 25 00 – Weather Barriers 07 25 00-1 – 07 25-00 3<br />

07 92 00 – Joint Sealants 07 92 00-1 – 07 92 00-11<br />

Division 08 – Openings<br />

08 11 13 – Hollow Metal Doors and Frames 08 11 13-1 – 08 11 13-9<br />

08 31 13 – Access Doors and Frames 08 31 13-1 – 08 31 13-4<br />

08 71 00 – Door Hardware 08 71 00-1 – 08 71 00-15<br />

Division 09 – Finishes<br />

09 21 16.23 – Gypsum Board Shaft Wall Assemblies 09 21 16.23-1 – 09 21 16.23-4<br />

09 29 00 – Gypsum Board 09 29 00-1 – 09 29 00-5<br />

09 65 13 – Resilient Base and Accessories 09 65 13-1 – 09 65 13-4<br />

09 91 13 – Exterior Painting 09 91 13-1 – 09 91 13-4<br />

09 91 23 – Interior Painting 09 91 23-1 – 09 91 23-5<br />

Division 10 – Specialties (Not Used)<br />

Division 11 – Equipment (Not Used)<br />

Division 12 – Furnishings (Not Used)<br />

Division 13 – Special Construction (Not Used)<br />

Division 14 – Conveying Equipment (Not Used)<br />

Division 21 – Fire Suppression (Not Used)<br />

Division 22 – Plumbing (Not Used)<br />

Division 23 – Heating, Ventilating, and Air Conditioning (HVAC)<br />

23 05 00 – Common Work Results for HVAC 23 05 00-1 – 23 05 00-5<br />

23 05 53 - Identification for HVAC Piping and Equipment 23 05 53-1 – 23 05 53-4<br />

23 05 93 - Testing, Adjusting, and Balancing for HVAC 23 05 93-1 – 23 05 93-9<br />

23 34 23 – HVAC Power Ventilators 23 34 23-1 – 23 34 23-5<br />

Division 25 – Integrated Automation (Not Used)<br />

Division 26 – Electrical<br />

26 05 00 – Common Work Results for Electrical 26 05 00-1 – 26 05 00-4<br />

26 05 19 – Low-Voltage Electrical Power Conductors and Cables 26 05 19-1 – 26 05 19-5<br />

26 05 26 – Grounding and Bonding for Electrical Systems 26 05 26-1 – 26 05 26-5<br />

Page TOC - 2<br />

Table of Contents

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!