DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

area requires security badging. Workers in this area are required to obtain and display an AOA<br />

photo I.D. credential. Drivers in this area are required to obtain an Airport Vehicle Operator's<br />

Permit for the Air Operations Area.<br />

H. Beneficial Use: Use by The Authority prior to 100 percent completion and final acceptance.<br />

I. Contract Documents: Documents containing requirements of the Work. These include all<br />

Contract provisions and attachments made thereto or referenced therein.<br />

J. Contract Provisions: The administrative and procedural requirements starting at Award Date<br />

and ending at Final Acceptance, as provided for in Section VII, "Contract Provisions."<br />

K. Contract Time or Duration (Time Limit): The number of calendar days established in<br />

Section III, "Schedule," indicating the time allowed for the completion of all physical and<br />

administrative work contemplated in the Contract, including any authorized extensions thereto.<br />

L. Contracting Officer's Technical Representative (COTR): The Contracting Officer's designated<br />

representative, as defined in Section VII, "Contract Provisions."<br />

M. Contractor: Individual, partnership, corporation or joint venture under Contract to The<br />

Authority for performance of prescribed Work.<br />

N. Drawings: Erection/installation/construction plans, or any other supplementary plans or similar<br />

graphic data, illustrating work to be performed that are provided to Contractor as part of the<br />

Contract Documents.<br />

O. Directed: A command or instruction by The Authority. Other terms including "requested,"<br />

"authorized," "selected," "required," and "permitted" have the same meaning as "directed."<br />

P. Final Acceptance: Refer to Division 01 Section "Project Closeout."<br />

Q. "Indicated": Requirements expressed by graphic representations or in written form on<br />

Drawings, in <strong>Specifications</strong>, and in other Contract Documents. Other terms including "shown,"<br />

"noted," "scheduled," and "specified" have the same meaning as "indicated."<br />

R. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having<br />

jurisdiction, and rules, conventions, and agreements within the construction industry that control<br />

performance of the Work.<br />

S. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly,<br />

installation, and similar operations.<br />

T. "Install": Operations at Project site including unloading, temporarily storing, unpacking,<br />

assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing,<br />

protecting, cleaning, and similar operations.<br />

U. "Provide": Furnish and install, complete and ready for the intended use.<br />

REFERENCES 01 42 00 - 2