DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

4. O & M Manuals must be updated by supplement to reflect any field changes (by the<br />

BHSC), equipment changes due to warranty changes, etc., that were made during the<br />

warranty period of the system(s), so that all sets of the O & M Manuals shall reflect As-<br />

Built information.<br />

M. Testing prior to Commissioning:<br />

1. Submit testing program/procedure/plan, include network and redundant computer<br />

failover testing, 60 calendar days prior to actual testing for review and approval.<br />

2. Prior to final demonstration reviewed by the COTR, submit all approved testing<br />

program/procedure/plan, completely filled out, for review and use in the demonstration.<br />

N. Commissioning:<br />

1. Submit commissioning plan/procedure, include network and redundant computer failover<br />

testing, 60 calendar days prior to actual commissioning for review and approval.<br />

2. Prior to final demonstration reviewed by the COTR, submit all approved commissioning<br />

plan/procedure, completely filled out, for review and use in the demonstration.<br />

O. Training: Submit a draft copy of the training outline and program 60 calendar days prior to the<br />

start-up of the system for review and approval.<br />

P. As-Built Drawing: Prior to project closeout, submit revised BHS mechanical, electrical and<br />

structural layouts and assembly drawings showing all field changes to the approved<br />

configuration. Refer to Division 01 Section “Project Record Documents” for format<br />

requirements.<br />

Q. Spare Part Lists: Submit recommended and critical spare parts lists as identified in Part 3 of<br />

this Specification Section no later than 60 days prior to final testing.<br />

1.8 QUALITY ASSURANCE<br />

A. Baggage Handling System (BHS) Contractor Qualifications:<br />

1. BHS Project Manager: Subcontractor’s project manager who has successfully completed<br />

the installation and commissioning the previous five (5) years of at least two (2) systems<br />

of similar scope of Baggage Handling System as herein specified within the United<br />

States.<br />

2. Control Engineering Team:<br />

a. A Senior Control Engineer shall be assigned to the project as Lead Control<br />

Engineer and shall continue to work on the project site for the project duration.<br />

b. If the BHS/CBIS control and electrical engineering works including fabrication<br />

and installation are subcontracted to other firms, the BHSC shall submit a list of<br />

subcontractors (With The Proposal) for:<br />

1) Upper level control software and hardware,<br />

2) Lower level control software and hardware,<br />

3) MCP and panel fabrications,<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 12