22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1.7 WARRANTY<br />

A. General Warranty: The national project performance guarantee specified in this Article shall not<br />

deprive the Owner of other rights the Owner may have under other provisions of the Contract<br />

Documents and shall be in addition to, and run concurrent with, other warranties made by the<br />

Contractor under requirements of the Contract Documents.<br />

B. National Project Performance Guarantee: Provide a guarantee on AABC'S "National<br />

Standards" forms stating that AABC will assist in completing the requirements of the Contract<br />

Documents if the testing, adjusting, and balancing Agent fails to comply with the Contract<br />

Documents. Guarantee includes the following provisions:<br />

C. Special Guarantee: Provide a guarantee on NEBB forms stating that NEBB will assist in<br />

completing the requirements of the Contract Documents if the testing, adjusting, and balancing<br />

Agent fails to comply with the Contract Documents. Guarantee includes the following<br />

provisions:<br />

1. The certified Agent has tested and balanced systems according to the Contract<br />

Documents.<br />

2. Systems are balanced to optimum performance capabilities within design and<br />

installation limits.<br />

1.8 SEQUENCING AND SCHEDULING<br />

A. Test, adjust, and balance the air systems before hydronic systems.<br />

B. Final Testing, Adjusting, and Balancing: Test, adjust, and balance air conditioning systems<br />

during summer season and heating systems during winter season, including at least a<br />

period of operation at outside conditions within 5 degrees F wet bulb temperature of<br />

maximum summer design condition, and within 10 degrees F dry bulb temperature of minimum<br />

winter design condition. Take final temperature readings during seasonal operation.<br />

1. Summer Design Conditions: 92 degrees F DB, 76 degrees F WB.<br />

2. Winter Design Conditions: 20 degrees F DB.<br />

PART 2 - PRODUCTS (Not Applicable)<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine the Contract Documents to become familiar with Project requirements and to discover<br />

conditions in systems' designs that may preclude proper TAB of systems and equipment.<br />

B. Examine the approved submittals for HVAC systems and equipment.<br />

TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!