DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

evidence that the offeror has made such examination and is satisfied as to the conditions to be<br />

encountered in performing the Work as to the requirements of the Contract.<br />

1.20 AIRPORT SECURITY/VEHICLE INSPECTION PROCEDURE<br />

A. The number of vehicular access points into secure areas at Ronald Reagan <strong>Washington</strong> National<br />

Airport has been reduced to an operational minimum. There is only one gate available for all<br />

vehicular traffic - Gate A.<br />

B. The following procedures will be utilized for all escorted vehicles and AOA approved vehicles<br />

with non-badged passengers seeking entry to the AOA:<br />

1. All vehicles are searched.<br />

2. Coordinate all vehicle deliveries with the COTR in advance. Provide the vehicle license<br />

plate number and expected delivery time for all vehicle deliveries. Contractor may<br />

compile the expected daily delivery schedule on one sheet for submission to the COTR.<br />

3. The vehicle operator shall have in his or her possession a commercial manifest, which<br />

identifies the contents of the vehicle and/or trailer.<br />

4. An escort from the company for whom the shipment is intended shall respond to the<br />

vehicle access gate and remain with the vehicle until the vehicle exits the secured area.<br />

5. A vehicle search will be conducted and once cleared; vehicles will be permitted escorted<br />

access to their delivery point.<br />

6. Contractors should expect minor delays at Gate A as a result of these security provisions.<br />

7. Priority consideration may be offered to concrete trucks with resulting delays estimated<br />

to be 20 minutes. To receive priority consideration, schedule concrete deliveries with<br />

Airport Operations and COTR at time of batching.<br />

C. Prior approval from the Manager of Airport Operations or his/her designated representative is<br />

required for any exceptions to the above procedures.<br />

PART 2 - PRODUCTS (Not Used)<br />

PART 3 - EXECUTION (Not Used)<br />

END OF SECTION 00 73 00<br />