DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1.8 WARRANTY<br />

A. Warranties of products furnished under this Division shall comply with the requirement of the<br />

individual technical specifications. Where specific durations and scope is not specifically<br />

indicated, product and systems warranties shall be 1 year or greater (if greater then 1 year is the<br />

standard offering) and include all products, parts, installation and workmanship. In the case of<br />

software systems all labor and materials (software programs) to configure and correct any<br />

product deficiencies.<br />

1.9 DAMAGE<br />

A. The Contractor shall be responsible for any damage to any surfaces or work disrupted as a result<br />

of his work. Repair of surfaces including painting shall be included as necessary.<br />

1.10 MAINTENANCE AND SERVICES<br />

A. General Requirements: Contractor shall provide all services required and equipment necessary<br />

to maintain the entire system in an operational state as specified for a period of 1 year after<br />

formal written acceptance of the system, and shall provide all necessary material required for<br />

performing scheduled adjustments or other nonscheduled work.<br />

1.11 PROJECT SCOPE, PROJECT COORDINATION AND RELATED WORKS PROJECTS<br />

A. Contractor shall refer to Division 01 Section “Summary” for a description of related work that<br />

may affect the work required of the Contractor.<br />

B. Contractor shall:<br />

1. Seal all openings through rated walls made by other Contractors for use by this<br />

Contractor including tray and conduit penetrations. Re-enterable material shall be used<br />

that is in compliance with Division 07 Section “Penetration Firestopping and the<br />

requirements of Division 27 Section “Common Work Results for Communications.”<br />

1.12 DAILY SITE MAINTENANCE AND CLEAN-UP<br />

A. At the end of each work day (period) the Contractor shall be required to clean-up the work area<br />

and all construction debris such that the site is clean and usable without hazard to the general<br />

public, airport staff and tenants.<br />

B. Debris shall be removed daily and depending on the work area swept clean or vacuumed<br />

accordingly. Areas where vacuum shall occur daily shall be in any finished space including but<br />

not limited to areas of the Terminal or Airport Control center. Areas where sweeping would be<br />

considered acceptable would include utility spaces such as equipment rooms and the Garage.<br />

BASIC TELECOMMUNICATION REQUIREMENTS 27 05 01 - 8