DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. Submit catalog cut sheets, technical data sheets, manufacturer specifications and/or<br />

diagrams necessary to illustrate a product, material or system for provision of the work.<br />

Product data literature is required on all items of material and equipment and should be<br />

clearly marked; identifying specific items proposed with a reference to the specification<br />

requirement the item is being submitted for.<br />

2. Product data shall include adequate descriptive literature and catalog cut sheets required<br />

for the Engineer to ascertain that the proposed equipment and materials comply with the<br />

Contract requirements.<br />

D. System Shop Drawings:<br />

1. The shop drawings shall be approved by the Contract Officer’s Technical Representative<br />

(COTR) prior to system installation.<br />

2. Floor plans detailing all devices, conduit and raceway systems.<br />

3. Equipment room layouts to scale including equipment cabinet and wall elevations.<br />

4. System One-Line and Block Diagrams. Including connections to the existing fiber optic<br />

backbone system detailing all cross connects installed as part of the installation of this<br />

system back to the ACAM System headend.<br />

5. Door Rough-in Details.<br />

6. Point-to-Point Wiring Diagrams.<br />

7. Prepare using the latest release of AutoCAD and deliver files to the COTR.<br />

E. Manuals<br />

1. Provide complete sets of manuals and other information necessary for the operation and<br />

maintenance of the equipment installed by the Contractor in accordance with this<br />

specification and Division 01 requirements.<br />

2. Manuals: Manuals shall include names, addresses, and telephone numbers of each<br />

subcontractor installing equipment and systems, and nearest service representatives for<br />

each item of equipment for each system.<br />

a. The manuals shall have a table of contents and tab sheets.<br />

b. Tab sheets shall be placed at the beginning of each chapter or section and at the<br />

beginning of each appendix.<br />

c. The final copies delivered after completion of testing shall include all<br />

modifications made during installation, checkout, and testing.<br />

F. Record Shop Drawings: Provide a copy of corrected, approved shop drawings for the project,<br />

updated to show as-built conditions. Include the manufacturers' brochures in the as-built<br />

documentation. Drawings shall indicate exact device locations, panel terminations, cable routes<br />

and wire numbers as tagged and color-coded on the cable tag. Final point-to-point wiring<br />

diagrams of each type of device shall be included in the as-builts. Prepare as-builts using the<br />

latest release of AutoCAD and deliver files to the COTR:<br />

G. Warranty information: All materials relating to warranties.<br />

H. Manufacturer’s training certifications of installation personnel.<br />

ACCESS CONTROL AND ALARM MONITORING SYSTEM 28 13 00 - 3