22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

B. Restore permanent facilities used during construction to their specified condition.<br />

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired<br />

without visible evidence of repair.<br />

D. Repair components that do not operate properly. Remove and replace operating components<br />

that cannot be repaired.<br />

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.<br />

END OF SECTION 01 73 00<br />

EXECUTION 01 73 00 - 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!