22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

2.5 ELECTRICAL COMPONENTS<br />

A. General:<br />

1. Materials shall be of the quality specified herein, new, free from defects, of the best<br />

commercial/industrial grade, and approved by a nationally recognized testing laboratory<br />

wherever published standards exist. Each type of material shall be of the same make and<br />

manufacturer throughout the project. Materials shall comply with NEC or Local Code<br />

requirements, whichever are more stringent.<br />

2. The electrical equipment identified herein is based on products by different<br />

manufacturers and indicates the level of quality and performance required for the<br />

equipment. Provided that the equipment is equal in quality and performance to that<br />

identified herein and meets the requirements of these contract documents, electrical<br />

equipment by Allen-Bradley, Schneider Electric, Cutler-Hammer, Square D, or as<br />

acceptable to The Authority is acceptable for use in this Work.<br />

3. All computers, PLCs, and other components with processor chips shall be “Year 2000”<br />

and “New Daylight Saving Time” compliant. Refer to Warranty section identified herein<br />

for design failure requirements.<br />

B. Motor Control Panels (MCP):<br />

1. Panels shall be designed and arranged by a control company with a history of 5 years<br />

experience of previous work in BHS. Control panels shall be provided fully designed<br />

and manufactured ready to install for field connected wiring. BHSC shall install panels<br />

secured to floor to withstand earthquake conditions of 1.5 times panel force. Provide<br />

fluorescent light fixture(s) inside each motor control panel to properly light electrical<br />

equipment and tagging, which shall turn on when MCP door is opened.<br />

2. Control Device Identification: MCP component identification shall be provided so that<br />

all relays, timers, starters, overloads, fuses, etc. can be readily identified when the MCP<br />

door is opened. In addition to all prime manufacturers' nameplates, all electrical and<br />

mechanical control items mounted in or on panels or pushbutton stations shall be further<br />

identified in the system by permanently attached corrosion-proof, etched, engraved, or<br />

stamped identification plates. Dymo-type labels are not acceptable.<br />

3. All motor control panels and surface-mounted enclosures shall be NEMA Type 12,<br />

except those exposed to direct rain, which shall be Type 3 or 4 Weatherproof. MCP shall<br />

be Hoffman Heavy-Duty Free-Standing Enclosure or as acceptable to The Authority.<br />

Other panels shall be Hoffman or as acceptable to The Authority.<br />

4. Main Power Shutoff: Shall be a heavy duty, 480-Volts, 3 Phase, fused switch. Shutoff<br />

shall be General Electric, Allen-Bradley, Square D or as acceptable to The Authority.<br />

Fuses shall be up to 600A - RK1 fuses. Shutoff shall be installed inside housing with<br />

operating handle arranged for connect or disconnect with doors of control panel in closed<br />

position. Size for added 30% code motor load. The BHSC shall install all required<br />

warning placards on all MCPs.<br />

5. Emergency Power Fusible Disconnect Switch and Operating Mechanism: Shall be a<br />

heavy duty, 480 Volts, 3 Phase, fused. Disconnect shall be General Electric, Allen<br />

Bradley, Square D or as acceptable to The Authority. Fuses shall be RK1 fuses.<br />

Disconnect shall be installed inside the MCP. Size for added 30% code motor load. The<br />

BHSC shall install all required warning placards on all MCPs.<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!