DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

SECTION 28 13 00 – ACCESS CONTROL AND ALARM MONITORING SYSTEM<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. The work defined in this section and related drawings consist of the extension of the existing<br />

Software House C•CURE Access Control and Alarm Monitoring System (ACAM). The ACAM<br />

System shall consist of, but not be limited to, intelligent controllers, card readers with PIN pads,<br />

power supplies, and audio/visual devices.<br />

B. The Contractor shall provide all required equipment, raceways, cabinets, cabling, field<br />

terminations, and test and checkout for all work specified herein and detailed on the Contract<br />

Drawings.<br />

C. The Contractor’s scope of work (SOW) shall consist of the provision of all required material<br />

and labor required for physically complete and functional extension of the existing system.<br />

Work shall be limited to all required field work for the installation of the security portals as<br />

detailed on the Contract Drawings and as specified herein. This includes, but is not limited to,<br />

the installation of the security devices at the portals, intelligent controllers and power supplies.<br />

D. Installation of the Ethernet switches and Category 6A cabling and jumpers shall be provided by<br />

the Division 27 Contractor.<br />

E. Terminations of the field devices at the intelligent access controllers, final connection to the<br />

existing headend and all system programming shall be performed by The Authority’s Security<br />

Maintenance Contractor.<br />

F. Upon completion of the installation of all equipment and devices, field testing and system<br />

programming by The Authority’s Security Maintenance Contractor the Contractor shall jointly<br />

test all portals with The Authority and its Security Maintenance Contractor to verify proper<br />

system operation.<br />

G. The work described in this section includes engineering, design, labor, materials, equipment,<br />

installation, programming, and services necessary for a physically complete and functional<br />

system. Materials, equipment, appurtenances, or labor not specifically mentioned in this<br />

specification, or not shown on the Contract Drawings, but required for proper installation,<br />

performance, and operation of the equipment or systems, shall be furnished and installed by the<br />

Contractor.<br />

H. Related Sections:<br />

1. Division 01 – All Applicable Sections.<br />

2. Division 08 Section “Door Hardware.”<br />

3. Applicable Division 26 Sections.<br />

4. All Division 27 Sections.<br />

5. All Division 28 Sections.<br />

ACCESS CONTROL AND ALARM MONITORING SYSTEM 28 13 00 - 1