DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. Terminal A Improvements (Near Term): Task Order 01 – TSA Security Screening Check<br />

Point (SSCP); includes the construction of a new TSA approved check-point located at<br />

the west of the existing circulation throat which connects Terminal A to the “Banjo” hold<br />

rooms.<br />

2. Terminal A Improvements (Near Term): Task Order 3.1 Lobby Improvements, –<br />

FLOORING; includes the replacement of the existing flooring with porcelain tile.<br />

3. Terminal A Improvements (Near Term): Task Order 3.2 Lobby Improvements, –<br />

TICKET COUNTERS; includes the replacement of the existing ticket counters with new<br />

millwork and inserts to match the JetBlue Lobby.<br />

4. Terminal A Improvements (Near Term): Task Order 3.5.1 Lobby Improvements, –<br />

FINISHES; includes the updating most of the remaining finishes in the existing Terminal<br />

A Lobby.<br />

5. Terminal A Improvements (Near Term): Task Order 4 – Outbound Baggage Facility;<br />

includes the design and construction of a new pre-engineered baggage handling facility<br />

building and outbound baggage handling system from the existing Terminal A TSA<br />

screening area to the new building.<br />

6. Terminal A Banjo Standby Generator Upgrade<br />

7. South Hangar Standby Power Upgrade<br />

1.6 ACCESS TO SITE<br />

A. General: Contractor shall have limited use of Project site for construction operations as<br />

indicated on Drawings by the Contract limits and as indicated by requirements of this Section.<br />

B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not<br />

disturb portions of Project site beyond areas in which the Work is indicated.<br />

1. Limits: Confine construction operations to the baggage conveyor right-of-way, the lower<br />

level baggage make-up area and the TSA Baggage Screening Area.<br />

2. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances<br />

serving premises clear and available to The Authority, The Authority's employees,<br />

tenants, traveling public, and emergency vehicles at all times. Do not use these areas for<br />

parking or storage of materials.<br />

a. Schedule deliveries to minimize use of driveways and entrances by construction<br />

operations.<br />

b. Schedule deliveries to minimize space and time requirements for storage of<br />

materials and equipment on-site.<br />

C. Condition of Existing Building: Maintain portions of existing building affected by construction<br />

operations in a weathertight condition throughout construction period. Repair damage caused<br />

by construction operations.<br />

SUMMARY 01 10 00 - 3