DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

E. Install hangers to provide minimum ½-inch space between finished covering and adjacent work.<br />

F. Place hangers within 12 inches of each horizontal elbow.<br />

G. Use hangers with 1½-inch minimum vertical adjustment.<br />

H. Support vertical piping at floor penetration.<br />

I. Where several conduits can be installed in parallel and at same elevation, provide multiple or<br />

trapeze hangers.<br />

J. Design hangers for movement without disengagement of supported conduit.<br />

K. Conduits shall not be hung or supported from each other.<br />

L. Where support members are welded to structural building framing, scrape, brush clean, and<br />

apply one coat of zinc rich primer to welding.<br />

M. Provide hangers adjacent to motor driven equipment with vibration isolation.<br />

N. Use a separate hanger for each branch.<br />

O. Support vertical risers at the floor with extension conduit clamps approved by the COTR.<br />

3.7 TESTING<br />

A. Provide test plan and procedures documentation for system in accordance with Division 26 and<br />

as specified herein.<br />

B. Provide system test plans and procedures including test plan narrative, step-by-step procedure<br />

instructions, list of test equipment used, and expected results.<br />

C. Provide all personnel, equipment, instrumentation, and supplies necessary to perform all testing.<br />

D. Upon completion of the installation and testing of all field devices and equipment back to the<br />

CCTV headed and completion of programming by The Authority the Contractor shall jointly<br />

test and document the system extension with The Authority’s maintenance contractor. All<br />

devices, equipment and system programming shall be tested 100 percent. This is to include:<br />

1. Verification that the video and power cabling has been installed, tested, and approved.<br />

2. Verification that all video sources and video outputs provide a full bandwidth signal that<br />

complies with EIA-170 and EIA-170-A at all video inputs.<br />

E. Field-mounted devices shall be tested via actual activation of the devices under normal<br />

operating conditions rather than simulated activations.<br />

F. Where system testing will cause outages or impacts, schedule testing activities so as to impose<br />

the least inconvenience on system users, Airport tenants, and other Airport agencies. This may<br />

VIDEO SURVEILLANCE SYSTEM 28 23 00 - 11