DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. Re-inspection: Request re-inspection when the Work identified in previous inspections<br />

as incomplete is completed or corrected.<br />

2. Punch list work must be completed within the duration specified in Section III,<br />

"Schedule." Failure to complete the punch list work within the duration specified may<br />

result in the Contracting Officer ordering the work to be completed by others at the cost<br />

to Contractor.<br />

3. Results of completed inspection will form the basis of requirements for Final Acceptance.<br />

1.4 FINAL COMPLETION AND ACCEPTANCE<br />

A. Definition: "Final Completion" is the stage in the Contract when the Contracting Officer<br />

determines that all Work has been 100 percent completed according to the terms and conditions<br />

of the Contract Documents, including administrative obligations. The date of Final Acceptance<br />

is the date of execution by the Contracting Officer of a Certificate of Final Acceptance.<br />

B. Preliminary Procedures: Before requesting final inspection for determining date of Final<br />

Completion, complete the following:<br />

1. Submit a final Application for Payment according to Division 01 Section "Application<br />

for Payment."<br />

2. Submit certified copy of COTR's Substantial Completion inspection list of items to be<br />

completed or corrected (punch list), endorsed and dated by COTR. The certified copy of<br />

the list shall state that each item has been completed or otherwise resolved for<br />

acceptance.<br />

3. Submit a Contractor/COTR joint statement evidencing that all Record Documents,<br />

Operation and Maintenance Manuals, warranties, and similar required submittals have<br />

been approved.<br />

4. Complete demobilization and removal of temporary facilities from the site including<br />

construction equipment and facilities, mockups, and other similar elements. Restore<br />

areas to previously existing condition, if applicable.<br />

5. Execute final Contract Modification and submit final Subcontractor Payment Form.<br />

6. Return all AOA badging and all Authority Ids.<br />

7. Submit evidence of final, continuing insurance coverage complying with insurance<br />

requirements.<br />

8. Submit Record Contract CPM Schedule.<br />

9. Submit warranty book.<br />

10. Submit pest-control final inspection report and warranty.<br />

C. Inspection: Submit a written request for final inspection for acceptance. On receipt of request,<br />

COTR will either proceed with inspection or notify Contractor of unfulfilled requirements.<br />

COTR will prepare a final Certificate for Payment after inspection or will notify Contractor of<br />

construction that must be completed or corrected before certificate will be issued.<br />

1. Re-inspection: Request re-inspection when the Work identified in previous inspections<br />

as incomplete is completed or corrected.<br />

PROJECT CLOSEOUT 01 77 00 - 3