DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

5. Remove and replace malfunctioning units and retest as specified above.<br />

C. Cables will be considered defective if they do not pass tests and inspections.<br />

END OF SECTION 26 05 19<br />

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 5