22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or<br />

excess materials on The Authority's property. Do not discharge volatile, harmful, or dangerous<br />

materials into drainage systems. Remove waste materials from Project site and dispose of<br />

lawfully.<br />

1. Where extra materials of value remaining after completion of associated Work have<br />

become The Authority's property, arrange for disposition of these materials as directed by<br />

COTR.<br />

END OF SECTION 01 77 00<br />

PROJECT CLOSEOUT 01 77 00 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!