DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

transport shall turn to the south on the departures level to be routed into the TSA<br />

bag screening space.<br />

b. A new stainless steel fire/security door located on the inside of the dog house and<br />

controlled by the BHS<br />

c. A catwalk system shall be provided along the conveyor line.<br />

d. The conveyor line, with catwalk, shall be hung from the departures level in this<br />

function zone, and enclosed in a facility enclosure.<br />

e. The control stations shall be provided along the conveyor line as indicated herein.<br />

f. There are multiple sets of visual and audible warning beacons along the conveyor<br />

line.<br />

4. Function Zone 3 – TSA Baggage Screening Area<br />

a. The curbside line shall end at a lateral conveyor, just after emerging from the dog<br />

house in the TSA baggage screening space. The lateral shall ‘forward and store’<br />

bags near the head-end photoeye.<br />

b. A new stainless steel fire/security door located on the inside of the dog house and<br />

controlled by the BHS<br />

c. A control station shall be provided at the end of the lateral.<br />

d. A set of visual and audible warning beacons shall be located at the lateral.<br />

e. The drive of the lateral conveyor shall be provided with a Variable Frequency<br />

Drive (VFD).<br />

C. Coordination of the Work:<br />

1. The Baggage Handling System Contractor (BHSC) shall coordinate with General<br />

Contractor, The Authority, and other system suppliers that interface with BHS for BHS<br />

demolition work and construction phasing. The BHSC shall not interrupt baggage<br />

processing flow during the BHS demolition work and construction phasing. The<br />

airline/airport operation and maintenance teams will also occupy and access the<br />

construction site anytime (i.e. 24 hours a day, 7 days a week, 365 days a year); the BHSC<br />

shall coordinate with the airline/airport operation and maintenance teams.<br />

2. The Baggage Handling System Contractor (BHSC) shall provide a minimum of one (1)<br />

staff member (Site Lead) for coordination on site throughout the construction period.<br />

1.7 SUBMITTALS<br />

A. Submittal Procedures: Refer to Division 01 Section “Submittals” for submission procedures.<br />

BHSC shall submit for this Work a schedule of submittals with delivery dates prior to<br />

submission of all other submittals and no more than 30 calendar days after award of contract for<br />

review and approval. No other submittals will be accepted until this schedule is approved.<br />

B. Compliance List: Submit a “Compliance List” no more than 30 calendar days after award of<br />

contract for review and approval. The compliance list shall clearly identify every clause of this<br />

specification whether the BHSC fully complies, partially complies or does not comply. If the<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 8