DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

a. H.264: 12 fps<br />

b. MJPEG: 12 fps<br />

8. Video Stream:<br />

a. Simultaneous H.264 (MPEG-4 Part 10/AVC) and MJPEG<br />

D. Pan/Tilt/Zoom: Digital PTZ with Presets<br />

E. Image Settings:<br />

1. Wide Dynamic Range<br />

2. Electronic Image Stabilization<br />

3. Privacy mask<br />

4. Compression<br />

5. Text and image overlay<br />

6. Auto-iris drive<br />

2.4 CABLE, WIRE AND CONNECTORS<br />

A. General: Provide all wire and cable types in accordance with the manufacturer’s<br />

recommendations. Wire and cable components shall be rated for the environment the wire or<br />

cable is to be installed in for a minimum of 20 years. ALL cabling installed shall be Plenum<br />

rated and ANSI-C2 CL2P certified.<br />

B. Cable/Wiring:<br />

1. Category 6A – Provided by Division 27 Contractor.<br />

PART 3 - EXECUTION<br />

3.1 GENERAL<br />

A. Install all system components and appurtenances in accordance with the manufacturer's<br />

instructions, applicable codes and standards and as shown, and provide all necessary<br />

interconnections, services, and adjustments required for complete and operable systems as<br />

specified and detailed on the Contract Documents. Control signals, communications, and data<br />

transmission line grounding shall be installed as necessary to preclude ground loops, noise, and<br />

surges from adversely affecting system operation.<br />

3.2 GENERAL INSTALLATION<br />

A. Where undefined by codes and standards, Contractor shall apply a safety factor of at least 2<br />

times the rated load to all fastenings and supports.<br />

VIDEO SURVEILLANCE SYSTEM 28 23 00 - 8