DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

a. Provide maximum 3-inch binder thickness.<br />

b. Identify each binder on front and spine, with printed title "PROJECT<br />

WARRANTIES," Contract number and name, and subject matter of contents. If<br />

identification cannot be attached to the front include it as the first page in the<br />

manual. Indicate volume number for multiple-volume sets. The use of business<br />

labels is prohibited.<br />

2. Dividers: Provide three-hole, heavyweight, plastic tabbed dividers, (, or as approved by<br />

The Authority) for each separate section. Provide laser printed description for each<br />

tabbed section on the front and back of tabs. Tabs shall indicate the appropriate<br />

Specification Section. Provide a description of the warranty or heading for sub tabs using<br />

the same laser printed format on the dividers. Provide an index of the contents in each<br />

section on the first page behind each section divider. The index shall be generated using<br />

a word processor and printed on a laser printer. Include a matching master table of<br />

contents for each volume using the same indexing system. Install a colored sheet<br />

between each different warranty within a tabbed section.<br />

D. Provide additional copies of each warranty that shall be include in Operation and Maintenance<br />

Manuals.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Cleaning Agents: For final cleaning, use cleaning materials and agents recommended by<br />

manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are<br />

potentially hazardous to health or property or that might damage finished surfaces.<br />

PART 3 - EXECUTION<br />

3.1 FINAL CLEANING<br />

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply<br />

with Authority requirements, local laws and ordinances and Federal and local environmental<br />

and antipollution regulations. General cleaning during construction is included in Division 01<br />

Section "Execution."<br />

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each<br />

surface or unit to condition expected in an average commercial building cleaning and<br />

maintenance program. Comply with manufacturer's written instructions.<br />

1. Complete the following cleaning operations before requesting inspection for certification<br />

of Substantial Completion for entire Project or for a portion of Project:<br />

PROJECT CLOSEOUT 01 77 00 - 5