22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

SECTION 28 23 00 - VIDEO SURVEILLANCE SYSTEM<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Contractor shall provide all work for a physically complete and functional extension of the<br />

Airport’s existing video surveillance system as specified herein and detailed on the Contract<br />

Drawings. Work shall be limited to the installation of cameras, varifocal lenses, enclosures,<br />

power supplies, fiber optic and Cat 6A jumpers, cabling and accessories between the new<br />

camera location, existing equipment rooms and the Main Operations Equipment Room.<br />

B. Installation of equipment within the Main Operations Equipment Room to expand the NICE<br />

Vision Pro IPTV headend, programming and connections from the existing fiber optic patch<br />

panels to the Security Network Core Switch shall be by The Authority’s Security Maintenance<br />

Contractor. All programming and software licenses for the incorporation of the additional<br />

cameras into the Airport’s Aegis KapLogic and Integraph Computer-Aided Dispatch systems<br />

shall be by the Authority.<br />

C. Work of this section includes wires/cables, raceways, electrical boxes and fittings, as specified<br />

in Division 27 Sections in conjunction with the video surveillance system.<br />

D. Comply with codes, ordinances, regulations, and other legal requirements of public authorities<br />

that bear on installation and performance of Work.<br />

E. The work described in this section includes engineering, design, labor, materials, equipment,<br />

installation, and services necessary for physically complete and functional system expansion.<br />

Materials, equipment, appurtenances, or labor not specifically mentioned in this Specification,<br />

or not shown on the Contract Drawings, but required for proper installation, performance, and<br />

operation of the equipment or systems, shall be furnished and installed by the Contractor.<br />

F. The work shown in the Contract Drawings is diagrammatic in nature and the Contractor is<br />

responsible for determining the final equipment locations, arrangements, and installation to<br />

meet site-specific requirements.<br />

G. Related Sections:<br />

1. Applicable Division 01 Sections.<br />

2. Applicable Division 26 Sections.<br />

3. Applicable Division 27 Sections.<br />

4. Division 28 Section “Access Control and Alarm Monitoring System.”<br />

1.2 REFERENCES STANDARDS<br />

A. General: The latest version of the following codes and standards shall be applicable.<br />

B. Code of Federal Regulations (CFR):<br />

VIDEO SURVEILLANCE SYSTEM 28 23 00 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!