22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

E. Manuals:<br />

1. Provide complete sets of manuals and other information necessary for the operation and<br />

maintenance of the equipment installed by the Contractor in accordance with Division 01<br />

requirements.<br />

2. Manuals: Manuals shall include names, addresses, and telephone numbers of each<br />

subcontractor installing equipment and systems, and nearest service representatives for<br />

each item of equipment for each system.<br />

a. The manuals shall have a table of contents and tab sheets.<br />

b. Tab sheets shall be placed at the beginning of each chapter or section and at the<br />

beginning of each appendix.<br />

c. The final copies delivered after completion testing shall include all modifications<br />

made during installation, checkout, and testing.<br />

F. Record Shop Drawings: Provide a copy of corrected, approved shop drawings for the project,<br />

updated to show as-built conditions. Include the manufacturers' brochures in the as-built<br />

documentation. Drawings shall indicate exact device locations, panel terminations, cable routes<br />

and wire numbers as tagged and color-coded on the cable tag. Final point-to-point wiring<br />

diagrams of each type of device shall be included in the as-builts. Prepare as-builts using the<br />

latest release of AutoCAD and deliver files to the COTR:<br />

G. Warranty information: All materials relating to warranties.<br />

H. Manufacturer’s training certifications of service personnel.<br />

1.6 QUALITY ASSURANCE<br />

A. Standards of workmanship shall meet or exceed accepted telecommunications systems industry<br />

installation practices.<br />

B. Refer to Division 27 Section “Basic Telecommunication Requirements” and Division 01<br />

Section “Quality Requirements” for quality assurance requirements.<br />

C. System hardware and software components shall be produced by a manufacturer regularly<br />

engaged in the production of video surveillance system equipment for at least 5 years.<br />

D. System Installer Qualifications: All Work shall be performed by qualified individuals having at<br />

least five (5) years experience installing and maintaining video surveillance systems. The<br />

qualified individuals shall have completed installation of at least two (2) systems of similar size<br />

and complexity within the past five (5) years. Submit evidence of successful installation, owner<br />

training and maintenance for a minimum of the previous five years. Provide listing of projects<br />

with verifiable references with names and telephone numbers.<br />

VIDEO SURVEILLANCE SYSTEM 28 23 00 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!