22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

J. Certification: Submit certification that the supervisory personnel have the required training and<br />

experience to perform their responsibilities within 30 calendar days after award of contract.<br />

K. Warranty Draft: Submit two (2) draft copies of BHS warranty and “New Daylight Saving<br />

Time” compliance warranty as specified herein for complete operating BHS for COTR’s<br />

review. Submit concurrent with shop drawings and include all specified inclusions.<br />

L. Operating/Maintenance Manuals:<br />

1. Submit Operation and Maintenance Manuals as specified herein and in Division 01<br />

Section “Operation and Maintenance Data”. 60 calendar days prior to completion,<br />

submit a draft copy for review. The COTR shall indicate their approval or comments<br />

related thereto and return the draft to the BHSC. Submit the final manual copies no less<br />

than 30 calendar days prior to substantial completion or date of beneficial use, whichever<br />

occurs first, as specified, but prior to training of personnel.<br />

2. Final O & M Manuals: These Manuals shall be bound in an orderly manner in loose-leaf<br />

lockable 3-ring binders with complete table of contents. A minimum of 15 sets shall be<br />

provided. Contents shall be divided into sections separated by dividers with properly<br />

labeled margin tabs. Manuals shall include the drawings as built, operating and<br />

maintenance instructions, wiring diagrams, connections and complete parts list of all<br />

items. Include manufacturer's literature, sources of purchase and similar information.<br />

Content of manual shall be acceptable to the COTR.<br />

a. In addition to the above, the operating section of the O&M Manual(s) shall include<br />

the following:<br />

1) Complete listing of electrical graphic symbols and reference designation per<br />

ANSI standards for all electrical equipment/components contained in the<br />

system(s).<br />

2) Summary, location, units controlled, and function of Pushbuttons,<br />

Photosensors, Limit Switches, etc.<br />

3) Normal system start-up and shutdown procedures of conveyor system(s).<br />

4) Detailed description of operational troubleshooting of the conveyor<br />

system(s).<br />

5) Electrical drawings:<br />

a) Complete As-Built schematics.<br />

b) Power and control device location layout.<br />

c) Power and control device field termination.<br />

d) Motor Control Panel (MCP) back panel layout diagram.<br />

e) MCP door layout diagram.<br />

f) Status panel layout diagram.<br />

g) Control station face plate and legend layout diagram.<br />

h) Programmable Logic Controller (PLC) ladder diagrams.<br />

3. The O & M Manuals shall fully cover appropriate safety measures, precautions and<br />

instructions to be followed before, during and after making repairs, adjustments, clearing<br />

jams, or performing routine maintenance, which shall conform to all established Federal,<br />

State, and Local Safety Laws and Regulations.<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!