22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1.6 COORDINATION REQUIREMENTS<br />

A. Coordination with Other Trades: The Contractor shall provide system technical requirements,<br />

shop drawings and schedule coordination as required with the Trades performing work required<br />

for the following Sections:<br />

1. Division 08 Section “Door Hardware.”<br />

1.7 WARRANTY<br />

A. Warranties shall be executed in the perpetuity of The Authority.<br />

B. Hardware Warranties shall extend for a minimum of One year following Project Acceptance by<br />

The Authority.<br />

1.8 SPARE PARTS<br />

A. Unless stated otherwise provide the following quantity of extra materials:<br />

1. Card Reader with PIN - 1<br />

2. Audio/Visual Device - 1<br />

3. Power Supply - 1<br />

PART 2 - PRODUCTS<br />

2.1 INTELLIGENT ACCESS CONTROL AND ALARM MONITORING PANEL<br />

A. Acceptable Manufacturer/Model: The access control panel shall be Software House iStar Pro<br />

Enterprise Control Panel with 64 Mbytes of memory, no substitutions.<br />

B. Include all General Control Modules (GCM), Access Control Modules (ACM), input modules<br />

(I8), output modules (R8) and power supplies as specified herein and as detailed on Sheet<br />

SS04.002. Install per The Authority’s standard arrangement of control panel and power<br />

supplies as detailed on Sheet SS0#.###. Any deviations from this standard must be approved in<br />

advance by the COTR. Refer to the Contract Drawings for the standard arrangement for the<br />

installation of the control panels and power supplies.<br />

C. Panel and Card Reader Power Supplies: Each panel shall be provisioned with two<br />

AL600ULACM power supplies as specified below.<br />

D. The panel communications shall be Ethernet (10/100 Base-T) and shall be fully functional<br />

during system and credential downloads.<br />

E. Enclosure: The panel enclosure shall be a UL rated NEMA 1 style metal cabinet designed for<br />

surface mounting. It shall have a tampered, hinged door with a high security key lock keyed<br />

ACCESS CONTROL AND ALARM MONITORING SYSTEM 28 13 00 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!