DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

SECTION 01 32 00 – DESIGN AND CONSTRUCTION PROGRESS DOCUMENTATION<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

A. Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other<br />

Division 01 Specification Sections apply to this Section.<br />

1.2 SUMMARY<br />

A. This Section specifies administrative and procedural requirements for various CPM schedules<br />

and reports required for proper performance of the Work.<br />

B. All costs incurred by Contractor to correctly implement and update the schedule shall be borne<br />

by Contractor and are part of this Contract.<br />

C. Schedules required include the following:<br />

1. CPM cost-loaded Design and Construction Schedule and related narrative.<br />

2. Contract Design and Construction Progress Schedule in CPM format and related<br />

narrative and cash flow projection curves.<br />

3. Design and Construction Submittals Schedule.<br />

4. Schedule of Tests and Inspections.<br />

5. Record, As-Built CPM Schedule.<br />

D. Reports required include the following:<br />

1. Daily Construction Reports.<br />

2. Material Location Reports.<br />

3. Field Correction Reports.<br />

4. Special Reports.<br />

5. Monthly Progress Reports.<br />

6. Contractor Quality Control Reports.<br />

E. Related Sections include the following:<br />

1. Division 01 Section "Application for Payment" for Schedule of Values.<br />

2. Division 01 Section "Project Management and Coordination" for Project meeting<br />

minutes.<br />

3. Division 01 Section "Quality Requirements" for test and inspection reports.<br />

4. Division 01 Section "Product Requirements" for Product List.<br />

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1