DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. Prepare a list of items to be completed and corrected (punch list), the value of items on<br />

the list, reasons why the Work is not complete, and a schedule for completing punch list<br />

work according to Section III of the Contract.<br />

2. Ensure previously outstanding technical submittals and Shop Drawings have been<br />

submitted and approved.<br />

3. Advise COTR of pending insurance changeover requirements.<br />

4. Submit warranties required by Contract Documents, workmanship bonds, maintenance<br />

service agreements, final certifications, and similar documents.<br />

a. Submit Contractor Warranty Letter, for review and approval, a minimum of 60<br />

days before requesting inspection for determining date of Substantial Completion.<br />

After date of Substantial Completion has been determined revise the Contractor’s<br />

Warranty Letter to include that date as start of Warranty period.<br />

5. Obtain and submit releases permitting The Authority unrestricted use of the Work and<br />

access to services and utilities. Include occupancy permits, operating certificates, and<br />

similar releases.<br />

6. Prepare and submit Project Record Documents except Record Contract CPM Schedule;<br />

also prepare and submit Operation and Maintenance manuals, Final Completion<br />

construction photographs and photographic negatives, damage or settlement surveys, and<br />

similar final record information.<br />

7. Prepare and submit proof that specified testing and code inspections have been<br />

completed, accepted and certified, including, but not limited to, structural work, sprinkler<br />

piping systems, fire alarm and FPS systems, bacteriological testing of domestic lines,<br />

back-flow prevention, electrical system testing, and hydrostatic pressure testing of<br />

sanitary lines. Submit approvals of Health Department or the FDA as applicable.<br />

8. Deliver tools, spare parts, extra materials, and similar items to location designated by<br />

COTR. Label with manufacturer's name and model number where applicable.<br />

9. Assist The Authority’s Locksmith with changeover of lock cylinders. Advise the<br />

Authority's personnel of changeover in security provisions.<br />

10. Complete startup testing of systems.<br />

11. Submit test/adjust/balance records.<br />

12. Terminate and remove temporary facilities from Project site, along with mockups,<br />

construction tools, and similar elements.<br />

13. Advise The Authority of changeover in utilities.<br />

14. Submit changeover information related to The Authority's occupancy, use, operation, and<br />

maintenance.<br />

15. Instruct The Authority's personnel in operation, adjustment, and maintenance of products,<br />

equipment, and systems, as required by Division 01 Section "Demonstration and<br />

Training." Submit demonstration and training videotapes.<br />

16. Complete final cleaning requirements, including touchup painting.<br />

17. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual<br />

defects.<br />

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of<br />

request, COTR will either proceed with inspection or notify Contractor of unfulfilled<br />

requirements. COTR will prepare the Certificate of Substantial Completion after inspection or<br />

will notify Contractor of items, either on Contractor's list or additional items identified by<br />

COTR, that must be completed or corrected before certificate will be issued.<br />

PROJECT CLOSEOUT 01 77 00 - 2