DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1. The follow submittals shall be in addition to the requirements indicated in Division 01<br />

Section “Submittals.” Increase by the quantity listed below, the number of related shop<br />

drawings, product data, and samples submitted for Division 27 Sections.<br />

a. Shop Drawings – Initial Submittal: 2 additional copies of each blue- or black-line<br />

prints.<br />

b. Shop Drawings – Final Submittal: 2 additional copies of each blue- or black-line<br />

prints.<br />

c. Product Data: 1 additional copy of each item.<br />

d. Samples: 1 additional.<br />

e. Additional copies may be required by individual Sections of these <strong>Specifications</strong>.<br />

f. Test data: Submit all test data within 5 days of testing and as required by<br />

individual sections.<br />

2. Prepare coordination drawings detailing major elements, components, and systems of<br />

electrical equipment and materials in relationship with other systems, installations, and<br />

building components for related Division 27 Sections.<br />

3. For related Divisions 27 and 28 Sections, indicate locations where space is limited for<br />

installation and access. Indicate where sequencing and coordination of installations are<br />

of importance to the efficient flow of the Work, including (but not necessarily limited to)<br />

the following:<br />

a. Provide complete front panel equipment fabrication dimensions with equipment<br />

locations of equipment racks and cabinets.<br />

b. Provide equipment wiring terminal point-to-point color-coded wiring diagrams.<br />

Drawings shall show each item of equipment, locations, all wiring, and all<br />

connections. Wiring color code shall be as described by the specifications. If no<br />

color code is specifically mentioned, the color code shall be as recommended by<br />

the equipment manufacturer.<br />

c. All sheets shall be sized to match contract drawings and shall be executed in a neat<br />

and professional manner (see Contract Drawings). All devices schematically<br />

represented on wiring diagrams shall be identified with room numbers<br />

corresponding to equipment locations in the building.<br />

d. Submittal shall include block diagram of equipment to show equipment<br />

relationship and signal flow paths.<br />

4. Submittal information shall include the following manufacturer’s published data and<br />

specific data for the system or equipment submittal for approval:<br />

a. Complete operating instructions.<br />

b. Complete schematic drawings for each item of equipment.<br />

c. Complete maintenance instructions.<br />

5. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and<br />

ceilings and their relationship to other penetrations and installations. Submittal shall<br />

indicate the proposed locations of major raceway systems, equipment, and materials.<br />

Include the following:<br />

BASIC TELECOMMUNICATION REQUIREMENTS 27 05 01 - 2