22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

3) Instruments and Equipment: Use an infrared scanning device designed to<br />

measure temperature or to detect significant deviations from normal values.<br />

Provide calibration record for device.<br />

d. Test and adjust controls, remote monitoring, and safeties. Replace damaged and<br />

malfunctioning controls and equipment.<br />

4. Enclosed switches and circuit breakers will be considered defective if they do not pass<br />

tests and inspections.<br />

5. Prepare test and inspection reports, including a certified report that identifies enclosed<br />

switches and circuit breakers and that describes scanning results. Include notation of<br />

deficiencies detected, remedial action taken, and observations after remedial action.<br />

END OF SECTION 26 28 16<br />

ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!