DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

R. Enclosures and junction boxes located above unfinished spaces, such as lay-in ceilings, shall be<br />

clearly identified on the outside as “COMM.”<br />

S. Cable label format: Cables shall have a two line label attached using the following format:<br />

1. Line 1: ABCDxxxx-yyy-zzz.<br />

a. A = “F” for fiber optic cable, “U” for unshielded twisted pair cable (UTP), or “S”<br />

for shielded twisted pair cable.<br />

b. B = “S” for single mode, “M” for multimode, “3" for Category 3, “5" for Category<br />

5, etc.<br />

c. C = “V” for voice, or “D” for data.<br />

d. D = Floor, i.e. “B” for basement, “1" for first floor etc.<br />

e. xxxx = unique numerical identifier in cable management system.<br />

f. yyy-zzz = Conductor numbers in cable.<br />

2. Line two: Building/room identifier where cable is located, and building/room identifier<br />

end point of opposite end of cable.<br />

a. Contractor shall contact COTR for correct nomenclature for building and room.<br />

3. Labeling for user outlets shall be as directed by COTR as conditions may vary according<br />

to project.<br />

3.8 TESTING<br />

A. Test 100 percent of all telecommunications cables installed and submit test reports for all tests.<br />

B. Test Reports: Submit six (6) printed copies of a final test reports and communication circuit<br />

schedules (typed and bound) and six (6) electronic copies (CD media), which confirms that the<br />

cabling infrastructure has been tested, labeled and documented.<br />

1. All test results shall be delivered to COTR within four weeks after completion of the<br />

installation.<br />

2. Each report copy shall be labeled and submitted in white, three-ring view-binder(s).<br />

3. Test reports shall include:<br />

a. Pass/fail results and actual cable test data and required cable measurements and/or<br />

calculations for all installed cables.<br />

b. An installer-signed statement of compliance with specifications herein.<br />

c. All certificates of test equipment calibration/certification.<br />

d. All certificates of training for test personnel.<br />

e. All fiber and copper parameters specified below in the fiber and copper testing<br />

sections.<br />

f. All fiber optic backbone cable strands and port ID’s, cable length’s, each<br />

termination room ID and test results compliant with applicable standards and<br />

specifications.<br />

PREMISE WIRING DISTRIBUTION SYSTEM 27 10 00 - 15