DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

(Fiber-Optic Division), or as acceptable to The Authority.<br />

following requirements:<br />

Converters shall meet the<br />

a. Multi-mode or Single-mode Fiber Optic Cable Type.<br />

b. ST or SMA Connector.<br />

c. Transmit Launch Power: -15dbm (Typical Multi-mode) and -18dbm<br />

(Single-mode).<br />

d. Receive Sensitivity: -32dbm.<br />

e. Environmental Operating Temperature: 0 to 60 deg. C (32 to 140 deg. F).<br />

f. Environmental Storage Temperature: -40 to 85 deg. C (-40 to 185 deg. F).<br />

g. Environmental Relative Humidity: 0 to 95% RH, Non-Condensing.<br />

2. Fiber Optic Cabling: Provide Multi-Mode 62.5/125, dedicated network, FDDI grade<br />

cabling where necessary for connection to fiber optic converters and fiber optic<br />

communications backbone. Fiber optic backbone will be provided by others. Contractor<br />

shall coordinate all interface requirements with fiber optic backbone Contractor.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine conditions under which Baggage Handling System (BHS) work will be installed<br />

B. Notify COTR in writing of unsatisfactory conditions.<br />

3.2 INSTALLATION<br />

A. Site Interfaces:<br />

1. Responsibility of Baggage Handling System equipment.<br />

2. Cover and protect Baggage Handling System equipment from debris and dirt.<br />

3. Responsibility of removing daily erection debris and discarded materials.<br />

4. Equipment staging area will be assigned by Contractor.<br />

5. Coordinate the work schedule with Contractor.<br />

B. Welded Construction: Provide welded connections for fabrication and installation of work<br />

wherever bolted connections are not required for subsequent removal or for normal operation,<br />

adjustment, inspection, maintenance and replacement of worn parts. Comply with AWS<br />

standards for workmanship and for qualifications of welding operators.<br />

C. Installation Tolerances:<br />

1. Gaps between end rolls shall not exceed 1” except gap at the Security/Fire Doors, where<br />

gap shall not exceed 3”.<br />

2. Uneven joints in sideguards shall be epoxy filled and ground smooth to eliminate all snag<br />

points.<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 52