DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

3.5 PAINTING<br />

A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately<br />

after erecting hangers and supports. Use same materials as used for shop painting. Comply<br />

with SSPC-PA 1 requirements for touching up field-painted surfaces.<br />

1. Apply paint by brush or spray to provide minimum dry film thickness of 2.0 mils.<br />

B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply<br />

galvanizing-repair paint to comply with ASTM A 780.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 Quality Control<br />

A. Comply with applicable provisions of Division 01 Section “Quality Requirements” for<br />

requirements for Contractor Quality Control Program.<br />

B. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural<br />

Welding Code - Steel."<br />

C. Comply with NFPA 70.<br />

END OF SECTION 26 05 29<br />

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 29 - 5