DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

3.10 SPARE PARTS<br />

A. Spare Parts will not be purchased as part of this contract, but may be purchased after installation<br />

of the systems. The BHSC shall submit to the COTR, at the time that the system(s) design<br />

engineering has been completed (both electrical as well as mechanical), a list of all parts used in<br />

the development of the system(s). This complete listing of system(s) parts will then be used by<br />

the COTR to develop a listing of parts to be purchased as Spare Parts for the support of the<br />

system(s). This list must include the following:<br />

1. Name of part.<br />

2. Complete description of part.<br />

3. Each specific location that the listed part is used in the system(s).<br />

4. Total number of parts in the system(s).<br />

5. Manufacturer of the part.<br />

6. Manufacturer’s part number.<br />

7. Source of supply.<br />

8. Baggage System Contractor recommended quantity of spares per each item.<br />

9. Price per unit.<br />

10. Lead time or availability of part.<br />

B. The listing of the above information regarding parts must be provided for each system.<br />

C. Identify recommended and critical spare parts on the parts list and their prices for components<br />

that are not locally available and require shipping.<br />

D. Spare parts shall be deliverable within 24 hours notice, except for long lead items.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 GENERAL<br />

A. Comply with applicable provisions of Division 01 Section “Quality Requirements” for<br />

requirements for Contractor Quality Control Program.<br />

END OF SECTION 34 77 16<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 60