DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

D. Mockups: Build mockups to verify selections made under Sample submittals and to<br />

demonstrate aesthetic effects and set quality standards for materials and execution.<br />

1. Build mockups of typical double-agent ticket counter as shown on Drawings.<br />

2. Subject to compliance with requirements, approved mockups may become part of the<br />

completed Work if undisturbed at time of Substantial Completion.<br />

1.7 DELIVERY, STORAGE, AND HANDLING<br />

A. Curbside conveyor enclosure shall be stored in an area designated by the Authority.<br />

B. Preparation<br />

1. Before delivering enclosure, examine shop-fabricated work for completion and complete<br />

work as required.<br />

2. Repair any damaged and defective areas, where possible, to eliminate functional and<br />

visual defects; where not possible to repair, replace woodwork. Adjust joinery for<br />

uniform appearance.<br />

C. Protect exposed surfaces, edges, reveals and secure all removable and opening components.<br />

D. Deliver Ticket Counters Shells, Inserts, Posts, and Signage to the Authority at the following<br />

location:<br />

1. <strong>Metropolitan</strong> <strong>Washington</strong> <strong>Airports</strong> Authority<br />

Ronald Reagan <strong>Washington</strong> National Airport<br />

Warehouse Building, MA-134<br />

<strong>Washington</strong>, DC 20001-4901<br />

E. Coordinate fabrication, and delivery schedule with the COTR.<br />

F. Inspect the area designated by the Authority for storage of products prior to delivering products.<br />

Verify temperatures and humidity within the range recommended by the AWI. If conditions are<br />

unsuitable contact the COTR immediately.<br />

G. Deliver all products wrapped in protective coverings and suitable packs.<br />

1.8 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace components of signs that fail in materials or workmanship within specified warranty<br />

period.<br />

1. Curbside Conveyor Enclosure:<br />

a. Warranty Period: One year from date of Delivery Completion.<br />

PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS 06 41 16 - 3