DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

D. Avoid air entrapment during placement of grout.<br />

E. Place grout, completely filling equipment bases.<br />

F. Place grout on concrete bases and provide smooth bearing surface for equipment.<br />

G. Place grout around anchors.<br />

H. Cure placed grout.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 GENERAL<br />

A. Comply with applicable provisions of Division 01 Section “Quality Requirements” for<br />

requirements for Contractor Quality Control Program.<br />

END OF SECTION 23 05 00<br />

COMMON WORK RESULTS FOR HVAC 23 05 00 - 5