DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

3.7 TESTING<br />

A. The Contractor shall provide all personnel, equipment, instrumentation, and supplies necessary<br />

to perform all testing.<br />

B. COTR will witness all field tests.<br />

C. Contractor shall submit test results to COTR for approval and as required by individual<br />

Sections.<br />

3.8 AS-BUILT DRAWINGS<br />

A. Contractor shall develop as-built drawings for all systems and installations provided as part of<br />

the Project to provide Building Modifications to Accommodate In-Line Baggage Screening<br />

Systems.<br />

B. Comply with the requirements of Division 01 Section “Project Record Documents.”<br />

C. As-built Documentation shall consist of the initial shop and submittal drawing documentation<br />

requirements for each system revised to reflect installed conditions including final equipment<br />

and wiring configurations, labeling and testing results.<br />

D. All as-built drawings shall be produced in AutoCAD 2010 (or later) and delivered to the COTR<br />

in CD(s) in addition to hard copies in quantities as required per the Special and general<br />

Provisions.<br />

3.9 COTR’S FINAL INSPECTION<br />

A. Before requesting a final inspection, all systems shall be inspected by the equipment<br />

manufacturer’s representative and the Contractor. When the system and all equipment is in<br />

place and is operating properly, the manufacturer’s representative shall develop and complete a<br />

checkout memo and have all equipment ready for final inspection. One week prior to final<br />

inspection, final as-built drawings and brochures shall be provided to the COTR.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 GENERAL<br />

A. Comply with applicable provisions of Division 01 Section “Quality Requirements” for<br />

requirements for Contractor Quality Control Program.<br />

END OF SECTION 27 05 01<br />

BASIC TELECOMMUNICATION REQUIREMENTS 27 05 01 - 13