DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

D. Product Data Submittals:<br />

1. Product data submittals shall consist of catalog cut sheets, technical data sheets,<br />

manufacturer specifications, brochures and/or diagrams necessary to illustrate a product,<br />

material or system for some portion of the work.<br />

2. Product data literature is required on all items of material and equipment and should be<br />

clearly marked, identifying specific items proposed.<br />

3. Indicate the UL listing and NEC insulation type for each type of cable installed as part of<br />

the PWDS.<br />

E. Shop Drawings shall include the following drawings:<br />

1. Coordination Drawings: prepare and submit coordination drawings in detailing raceways<br />

and system components and materials in relationship with other building systems and<br />

components.<br />

2. Detail Drawings: submit detailed drawings for:<br />

a. Wall-mounted facilities on terminal backboards.<br />

b. Equipment rack and cabinet elevations for all termination locations.<br />

c. Detail drawings shall include clearances for servicing equipment, including space<br />

for equipment disassembly required for periodic maintenance.<br />

3. All sheets shall be sized to match Contract Drawings, shall be executed in a neat and<br />

professional manner, and shall include a right hand margin title block (see Contract<br />

Drawings).<br />

F. Contractor shall also submit the following:<br />

1. Contractor Qualifications.<br />

2. Record Documentation.<br />

3. Cable and equipment labeling schemes and sample labels.<br />

4. Reel tests of fiber optic cable from the manufacturer. Submit test reports with,<br />

manufacturers' specifications and any other information necessary to determine<br />

compliance with published performance documents.<br />

5. Test Reports. Refer to part 3 of the Specification for specific test and documentation<br />

requirements.<br />

G. Prior to assembling or installing the work, prepare and submit shop drawings and product data<br />

literature for review.<br />

H. The Contractor shall not purchase any materials or equipment prior to receipt of reviewed and<br />

accepted Submittals from the COTR.<br />

I. Review of product data shall not relieve the Contractor from responsibility for deviations from<br />

the Drawings or specifications, unless the Contractor has, in writing, called attention to such<br />

deviations at the time of submission and secured written approval.<br />

J. Record documents: Comply with the requirements of Division 01 Section “Project Record<br />

Documents.” Include:<br />

PREMISE WIRING DISTRIBUTION SYSTEM 27 10 00 - 6