DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

B. Test Program:<br />

sand or any materials can potentially damage the BHS and the building shall not be<br />

used as a load/weight. Both tests shall be witnessed by the COTR.<br />

h. The BHSC shall provide at least 40 hours of continuous operation under no-load<br />

conditions followed by a complete system(s) inspection for necessary corrections,<br />

belt adjustments. Such adjustments may include the requirement for retraining of<br />

the belts, re-tensioning of the belts and any required shorting of belting material<br />

required to meet the maximum take-up adjustment of 2%, as defined under the<br />

Section regarding Take-Up Pulleys. The 40 hours of testing shall be conducted a<br />

minimum elapsed time of two 20-hour days to a maximum of five 8-hour days.<br />

During the 40-hour no-load test, the BHSC shall record the actual current draw by<br />

each MCP in every hour interval; the record shall be included in the O&M manual.<br />

i. The BHSC shall also perform a 4-hour load test demonstration immediately<br />

following the Contractor’s 40 hour no-load test, before the system can cool down,<br />

for each system to be witnessed by the COTR as part of the commissioning effort,<br />

but can be performed prior to actual commissioning. Normal load condition shall<br />

be 160 bags per hour. This will require a minimum of 640 test bags; each test bag<br />

shall weight between 20 Lbs to 40 Lbs and the average bag length shall be between<br />

25” to 28”. A successful hour of operational testing shall be defined as the system<br />

meeting the performance requirements as defined in the Specification Section 2.1,<br />

Paragraph B. During the 4-hour load test, the BHSC shall record the actual current<br />

draw by each MCP in every 10 minute interval; the record shall be included in the<br />

O&M manual. If any items/concerns/defects are identified by the Authority during<br />

the test, the BHSC shall remedy the items/concerns/defects during the daytime<br />

hours, and the BHS shall be ready to test in the following night.<br />

j. The BHSC shall demonstrate specific conditions for the following equipment:<br />

1) Computer System Equipment including cold-backup switch over.<br />

2) Motor Control Panels (MCP).<br />

3) PanelView.<br />

k. The BHSC shall test all interfaces with other systems. The BHSC shall coordinate<br />

interface testing with all parties involved.<br />

1. The BHSC shall provide a Test Program for each system(s), which shall, at minimum,<br />

incorporate the requirements listed above in the Post-Installation Testing (BHSC’s<br />

Internal Testing) section in this Specification.<br />

2. The BHSC is required to develop a Test Program for each system identify and<br />

demonstrate all System Control Functions. The Test Plan is to list each Control Station,<br />

Control Devices, etc., and its related control function that is to be demonstrated/tested in<br />

a checklist format with “Pass” and “Fail” check boxes, date, and recorder’s initials for<br />

each item. Items that fail during a test shall be retested after corrections are made and<br />

another checklist shall be used in the test recording of the previously failed items. The<br />

BHSC shall provide COTR with all checklists produced during testing. The Test<br />

Program shall identify all conveyor types, motors, brake motors, VFDs, nominal speeds,<br />

actual speeds, HP, nameplate FLA, lengths of conveyor section, the required load for<br />

each conveyor section and test procedure; the test program shall be submitted by BHSC<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 55